Updated on 2024-07-11 GMT+08:00

Open/Close Resource

Functions

You can use the Open/Close Resource node to enable or disable Huawei Cloud services as required.

Parameters

Table 1 and Table 2 describe the parameters of the Open/Close Resource node.

Table 1 Parameters of Open/Close Resource nodes

Parameter

Mandatory

Description

Node Name

Yes

Name of a node. The name must contain 1 to 128 characters, including only letters, numbers, underscores (_), hyphens (-), slashes (/), less-than signs (<), and greater-than signs (>).

Service

Yes

Service to be opened or closed.

  • ECS
  • CDM

Open/Close Resource

Yes

Possible values:

  • On
  • Off

Instance

Yes

Object to be opened or closed, for example, to open a CDM cluster.

Table 2 Advanced parameters

Parameter

Mandatory

Description

Node Status Polling Interval (s)

Yes

How often the system check completeness of the node. The value ranges from 1 to 60 seconds.

Max. Node Execution Duration

Yes

Execution timeout interval for the node. If retry is configured and the execution is not complete within the timeout interval, the node will be executed again.

Retry upon Failure

Yes

Whether to re-execute a node if it fails to be executed. Possible values:

  • Yes: The node will be re-executed, and the following parameters must be configured:
    • Retry upon Timeout
    • Maximum Retries
    • Retry Interval (seconds)
  • No: The node will not be re-executed. This is the default setting.
    NOTE:

    If retry is configured for a job node and the timeout duration is configured, the system allows you to retry a node when the node execution times out.

    If a node is not re-executed when it fails upon timeout, you can go to the Default Configuration page to modify this policy.

    Retry upon Timeout is displayed only when Retry upon Failure is set to Yes.

Policy for Handling Subsequent Nodes If the Current Node Fails

Yes

Operation that will be performed if the node fails to be executed. Possible values:

  • Suspend execution plans of the subsequent nodes: stops running subsequent nodes. The job instance status is Failed.
  • End the current job execution plan: stops running the current job. The job instance status is Failed.
  • Go to the next node: ignores the execution failure of the current node. The job instance status is Failure ignored.
  • Suspend the current job execution plan: If the current job instance is in abnormal state, the subsequent nodes of this node and the subsequent job instances that depend on the current job are in waiting state.

Enable Dry Run

No

If you select this option, the node will not be executed, and a success message will be returned.

Task Groups

No

Select a task group. If you select a task group, you can control the maximum number of concurrent nodes in the task group in a fine-grained manner in scenarios where a job contains multiple nodes, a data patching task is ongoing, or a job is rerunning.