Configuring a Scheduling Calendar
You can configure a scheduling calendar and specify the working days for scheduling a job.
Constraints
This function is available for batch processing jobs but not for real-time processing jobs.
Procedure
- On the DataArts Studio console, locate a workspace and click DataArts Factory.
- In the left navigation pane, choose Configuration > Configure.
- Choose Scheduling Calendars.
- Click Add. The Create Scheduling Calendar dialog box is displayed.
Figure 1 Create Scheduling Calendar dialog box
- Set parameters for the scheduling calendar.
Set Calendar Name, Owner, Default Working Days, and Description.
You can select Mon to Fri or Mon to Sun for Default Working Days. By default, Mon to Fri is selected.
- Click OK.
After creating the calendar, you can use it for jobs. Go to the DataArts Factory console, open a job, click Scheduling Setup, select Run periodically for Scheduling Type, and select the calendar you have created for Scheduling Calendar.
More Operations
- Modify a calendar: Click Modify in the Operation column.
- Batch Select: Select all Mondays to Fridays of the current month.
- Invert Selection: Select all non-working days.
- Clear: Clear selected working days.
Figure 2 Modifying a scheduling calendar
- Delete a calendar: Click Delete in the Operation column.
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot