Updated on 2024-08-30 GMT+08:00
DataArts Factory
- How Many Jobs Can Be Created in DataArts Factory? Is There a Limit on the Number of Nodes in a Job?
- Does DataArts Studio Support Custom Python Scripts?
- How Can I Quickly Rectify a Deleted CDM Cluster Associated with a Job?
- Why Is There a Large Difference Between Job Execution Time and Start Time of a Job?
- Will Subsequent Jobs Be Affected If a Job Fails to Be Executed During Scheduling of Dependent Jobs? What Should I Do?
- What Should I Pay Attention to When Using DataArts Studio to Schedule Big Data Services?
- What Are the Differences and Relationships Between Environment Variables, Job Parameters, and Script Parameters?
- What Should I Do If a Job Log Cannot Be Opened and Error 404 Is Reported?
- What Should I Do If the Agency List Fails to Be Obtained During Agency Configuration?
- Why Can't I Select Specified Peripheral Resources When Creating a Data Connection in DataArts Factory?
- Why Can't I Receive Job Failure Alarm Notifications After I Have Configured SMN Notifications?
- Why Is There No Job Running Scheduling Log on the Monitor Instance Page After Periodic Scheduling Is Configured for a Job?
- Why Isn't the Error Cause Displayed on the Console When a Hive SQL or Spark SQL Scripts Fails?
- What Should I Do If the Token Is Invalid During the Execution of a Data Development Node?
- How Do I View Run Logs After a Job Is Tested?
- Why Does a Job Scheduled by Month Start Running Before the Job Scheduled by Day Is Complete?
- What Should I Do If Invalid Authentication Is Reported When I Run a DLI Script?
- Why Cannot I Select a Desired CDM Cluster in Proxy Mode When Creating a Data Connection?
- Why Is There No Job Running Scheduling Record After Daily Scheduling Is Configured for the Job?
- What Do I Do If No Content Is Displayed in Job Logs?
- Why Do I Fail to Establish a Dependency Between Two Jobs?
- What Should I Do If an Error Is Reported During Job Scheduling in DataArts Studio, Indicating that the Job Has Not Been Submitted?
- What Should I Do If an Error Is Reported During Job Scheduling in DataArts Studio, Indicating that the Script Associated with Node XXX in the Job Has Not Been Submitted?
- What Should I Do If a Job Fails to Be Executed After Being Submitted for Scheduling and an Error Displayed: Depend Job [XXX] Is Not Running Or Pause?
- How Do I Create Databases and Data Tables? Do Databases Correspond to Data Connections?
- Why Is No Result Displayed After a Hive Task Is Executed?
- Why Is the Last Instance Status On the Monitor Instance Page Either Successful or Failed?
- How Do I Configure Notifications for All Jobs?
- What Is the Maximum Number of Nodes That Can Be Executed Simultaneously?
- Can I Change the Time Zone of a DataArts Studio Instance?
- How Do I Synchronize the Changed Names of CDM Jobs to DataArts Factory?
- Why Does the Execution of an RDS SQL Statement Fail and an Error Is Reported Indicating That hll Does Not Exist?
- What Should I Do If Error Message "The account has been locked" Is Displayed When I Am Creating a DWS Data Connection?
- What Should I Do If a Job Instance Is Canceled and Message "The node start execute failed, so the current node status is set to cancel." Is Displayed?
- What Should I Do If Error Message "Workspace does not exists" Is Displayed When I Call a DataArts Factory API?
- Why Don't the URL Parameters for Calling an API Take Effect in the Test Environment When the API Can Be Called Properly Using Postman?
- What Should I Do If Error Message "Agent need to be updated?" Is Displayed When I Run a Python Script?
- Why Is an Execution Failure Displayed for a Node in the Log When the Node Status Is Successful?
- What Should I Do If an Unknown Exception Occurs When I Call a DataArts Factory API?
- Why Is an Error Message Indicating an Invalid Resource Name Is Displayed When I Call a Resource Creation API?
- Why Does a PatchData Task Fail When All PatchData Job Instances Are Successful?
- Why Is a Table Unavailable When an Error Message Indicating that the Table Already Exists Is Displayed During Table Creation from a DWS Data Connection?
- What Should I Do If Error Message "The throttling threshold has been reached: policy user over ratelimit,limit:60,time:1 minute." Is Displayed When I Schedule an MRS Spark Job?
- What Should I Do If Error Message "UnicodeEncodeError: 'ascii' codec can't encode characters in position 63-64: ordinal not in range(128)" Is Displayed When I Run a Python Script?
- What Should I Do If an Error Message Is Displayed When I View Logs?
- What Should I Do If a Shell/Python Node Fails and Error "session is down" Is Reported?
- What Should I Do If a Parameter Value in a Request Header Contains More Than 512 Characters?
- What Should I Do If a Message Is Displayed Indicating that the ID Does Not Exist During the Execution of a DWS SQL Script?
- How Do I Check Which Jobs Invoke a CDM Job?
- What Should I Do If Error Message "The request parameter invalid" Is Displayed When I Use Python to Call the API for Executing Scripts?
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
The system is busy. Please try again later.
For any further questions, feel free to contact us through the chatbot.
Chatbot