Help Center/ Cloud Operations Center/ User Guide/ Faults/ Issue Ticket Management/ Implementing Changes on the Live Network
Updated on 2025-08-08 GMT+08:00

Implementing Changes on the Live Network

Scenarios

On the Positioning solution page, if you select Need for Whether the live network needs to be changed, the issue ticket will be in the To be implemented on the live network status. At this point, you need to change the region where the issue ticket is belongs. The issue ticket is resolved only after the change is completed.

Prerequisites

On the Positioning solution page, you have selected Need for Whether the live network needs to be changed. The issue ticket is in the To be implemented on the live network status.

Implementing Changes on the Live Network

  1. Log in to COC.
  2. In the navigation pane on the left, choose Fault Management > Issues.
  3. On the Pending tab page, locate the target issue ticket and click its title.
  4. Click Live network implementation in the upper right corner.
  5. Set Live network implementation.

    • If the region needs to be changed, click Associated Change Order in the Operation column. For details about operations on change tickets, see Change Management.
    • If the region does not need to be changed, click No change required in the Operation column.
    • You can add a region or delete an existing region.

  6. Click Implement completed.

    After the live network implementation is completed, the ticket status changes to To be verified.