Creating a DR Task
Creating an Intra-Region Cluster-Level DR Task
Prerequisites
You can create a DR task only when the cluster is in the Available or Unbalanced state.
Procedure
- Log in to the GaussDB(DWS) console.
- In the navigation pane, choose Management > DR Tasks.
- On the displayed page, click Create.
- Select the type and enter the name of the DR task to be created.
- Type: Intra-region DR
- Name: Enter 4 to 64 case-insensitive characters, starting with a letter. Only letters, digits, hyphens (-), and underscores (_) are allowed.
- Configure the production cluster.
- Select a created production cluster from the drop-down list.
- After a production cluster is selected, the system automatically displays its AZ.
- Configure the DR cluster.
- Select the AZ associated with the region where the DR cluster resides.
The AZ of the DR cluster can be the same as that of the production cluster. In a 3-AZ cluster, any of the three AZs can be selected for DR.
- Cluster Name: Upon selecting an AZ for the DR cluster, the system will auto-filter DR clusters that fulfill the logical homogeneity criteria. Should there be no qualifying DR clusters, you can click Create DR Cluster to create a DR cluster with the same configuration as the production cluster.
- Select the AZ associated with the region where the DR cluster resides.
- Configure advanced parameters. Select Default to keep the default values of the advanced parameters. You can also select Custom to modify the values.
- The DR synchronization period indicates the interval for synchronizing incremental data from the production cluster to the DR cluster. Set this parameter based on the actual service data volume.
The default DR synchronization period is 30 minutes.
- The DR synchronization period indicates the interval for synchronizing incremental data from the production cluster to the DR cluster. Set this parameter based on the actual service data volume.
- Click OK.
The DR status will then change to Creating. Wait until the creation is complete, and the DR status will change to Not Started.
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.