Updated on 2024-11-07 GMT+08:00

Resuming a Stopped Project

Prerequisites

  • Project Status of an evaluation project is Stopped.
  • Frozen accounts cannot resume a stopped project.

Procedure

  1. Log in to the UGO console.
  2. In the navigation pane, choose Schema Migration > DB Evaluation.
  3. In the evaluation project list, locate the project in the Stopped status and click Resume in the Operation column.

    Figure 1 Resuming an evaluation project

  4. To prevent database collection from occupying resources for a long time, you can configure the collection timeout period. To modify DB Connection Timeout, click Edit. Then, select Skip Collection Timeout Object for Data collection.

    Figure 2 Editing settings
    • DB Connection Timeout: time limit within which the system attempts to connect to the database, in millisecond. The value ranges from 30000 to 3600000.
    • Skip Collection Timeout Object
      • Select this option: If the database connection times out, the system skips some objects and records the objects that failed to be collected, and continues to create an evaluation project.
      • Deselect this option: If the database connection times out, the evaluation project creation will be stopped. You need to change the database connection timeout and resume the creation of the project.

  5. To apply the current settings, click OK.