Updated on 2026-07-15 GMT+08:00

Checking the Migration Result

This section uses the PROCEDURE object type as an example to describe how to confirm the migration results.

Procedure

  1. When the verification progress reaches 100%, check the results.

    Figure 1 Migration completed

  2. Go to the Object List area, check the migration results of FUNCTION objects. FNC_MVPEP_INTERACAO is used as an example.

  3. Click Correct Objects in the Operation column for a successfully migrated object to view detailed information and the SQL code.

  4. Use DAS to connect to ugo in the Auto-ugo-gaussdbv5-tar-1 instance.

    For details about how to connect to a DB instance, see Adding Login Information.

  5. Verify that schema ugo_ete is displayed.
  6. In the Object List area, verify that the stored procedure FNC_MVPEP_INTERACAO is displayed.

Follow-up Operations