Esta página aún no está disponible en su idioma local. Estamos trabajando arduamente para agregar más versiones de idiomas. Gracias por tu apoyo.

On this page

Show all

Verifying Microsoft SharePoint Server 2016

Updated on 2023-03-30 GMT+08:00
  1. Open the SharePoint central administration.
    Figure 1 SharePoint central administration
  2. Select the method to configure the SharePoint farm. Click Cancel.

    To configure the SharePoint farm through the wizard, click Start the Wizard.

    Figure 2 SharePoint farm configuration
  3. In the SharePoint central administration, click Create site collections to create a SharePoint site.
    Figure 3 Creating a SharePoint site
  4. Set SharePoint site parameters.
    Figure 4 Setting SharePoint site parameters
  5. The SharePoint top-level site is created successfully. Click the link to open the page.
    Figure 5 SharePoint top-level site created successfully
  6. Open the SharePoint site, where you can design your web pages.
    Figure 6 SharePoint verification
Feedback

Feedback

Feedback

0/500

Selected Content

Submit selected content with the feedback