Bu sayfa henüz yerel dilinizde mevcut değildir. Daha fazla dil seçeneği eklemek için yoğun bir şekilde çalışıyoruz. Desteğiniz için teşekkür ederiz.

Compute
Elastic Cloud Server
Huawei Cloud Flexus
Bare Metal Server
Auto Scaling
Image Management Service
Dedicated Host
FunctionGraph
Cloud Phone Host
Huawei Cloud EulerOS
Networking
Virtual Private Cloud
Elastic IP
Elastic Load Balance
NAT Gateway
Direct Connect
Virtual Private Network
VPC Endpoint
Cloud Connect
Enterprise Router
Enterprise Switch
Global Accelerator
Management & Governance
Cloud Eye
Identity and Access Management
Cloud Trace Service
Resource Formation Service
Tag Management Service
Log Tank Service
Config
OneAccess
Resource Access Manager
Simple Message Notification
Application Performance Management
Application Operations Management
Organizations
Optimization Advisor
IAM Identity Center
Cloud Operations Center
Resource Governance Center
Migration
Server Migration Service
Object Storage Migration Service
Cloud Data Migration
Migration Center
Cloud Ecosystem
KooGallery
Partner Center
User Support
My Account
Billing Center
Cost Center
Resource Center
Enterprise Management
Service Tickets
HUAWEI CLOUD (International) FAQs
ICP Filing
Support Plans
My Credentials
Customer Operation Capabilities
Partner Support Plans
Professional Services
Analytics
MapReduce Service
Data Lake Insight
CloudTable Service
Cloud Search Service
Data Lake Visualization
Data Ingestion Service
GaussDB(DWS)
DataArts Studio
Data Lake Factory
DataArts Lake Formation
IoT
IoT Device Access
Others
Product Pricing Details
System Permissions
Console Quick Start
Common FAQs
Instructions for Associating with a HUAWEI CLOUD Partner
Message Center
Security & Compliance
Security Technologies and Applications
Web Application Firewall
Host Security Service
Cloud Firewall
SecMaster
Anti-DDoS Service
Data Encryption Workshop
Database Security Service
Cloud Bastion Host
Data Security Center
Cloud Certificate Manager
Edge Security
Blockchain
Blockchain Service
Web3 Node Engine Service
Media Services
Media Processing Center
Video On Demand
Live
SparkRTC
MetaStudio
Storage
Object Storage Service
Elastic Volume Service
Cloud Backup and Recovery
Storage Disaster Recovery Service
Scalable File Service Turbo
Scalable File Service
Volume Backup Service
Cloud Server Backup Service
Data Express Service
Dedicated Distributed Storage Service
Containers
Cloud Container Engine
SoftWare Repository for Container
Application Service Mesh
Ubiquitous Cloud Native Service
Cloud Container Instance
Databases
Relational Database Service
Document Database Service
Data Admin Service
Data Replication Service
GeminiDB
GaussDB
Distributed Database Middleware
Database and Application Migration UGO
TaurusDB
Middleware
Distributed Cache Service
API Gateway
Distributed Message Service for Kafka
Distributed Message Service for RabbitMQ
Distributed Message Service for RocketMQ
Cloud Service Engine
Multi-Site High Availability Service
EventGrid
Dedicated Cloud
Dedicated Computing Cluster
Business Applications
Workspace
ROMA Connect
Message & SMS
Domain Name Service
Edge Data Center Management
Meeting
AI
Face Recognition Service
Graph Engine Service
Content Moderation
Image Recognition
Optical Character Recognition
ModelArts
ImageSearch
Conversational Bot Service
Speech Interaction Service
Huawei HiLens
Video Intelligent Analysis Service
Developer Tools
SDK Developer Guide
API Request Signing Guide
Terraform
Koo Command Line Interface
Content Delivery & Edge Computing
Content Delivery Network
Intelligent EdgeFabric
CloudPond
Intelligent EdgeCloud
Solutions
SAP Cloud
High Performance Computing
Developer Services
ServiceStage
CodeArts
CodeArts PerfTest
CodeArts Req
CodeArts Pipeline
CodeArts Build
CodeArts Deploy
CodeArts Artifact
CodeArts TestPlan
CodeArts Check
CodeArts Repo
Cloud Application Engine
MacroVerse aPaaS
KooMessage
KooPhone
KooDrive
Help Center/ CloudPond/ Service Overview/ Deployment Requirements

Deployment Requirements

Updated on 2024-05-20 GMT+08:00

Evaluate whether your location is suitable for deploying an edge site based on the following tables.

If your location fails to meet the requirements, you can register an edge site and place an order on the console, and then contact the Huawei Cloud technical support for a solution.

Equipment Room

Table 1 Equipment room environment

Category

Requirement

Temperature

The ambient temperature ranges from 5°C to 35°C when the altitude of the equipment room is from –60 m to 1800 m.

The ambient temperature is reduced by 0.45°C per 100 meters when the altitude of the equipment room ranges from 1800 m to 3000 m.

Humidity

The ambient relative humidity range of 20 to 80 percent is optimal for server reliability and operator comfort, and no condensing is allowed.

Rack layout

Racks are at least 1 m away from walls or any obstacles.

Firefighting equipment

Gas fire extinguishers are provided in the equipment room where the racks are deployed.

Water resistance

Racks should not be installed near toilets, kitchens, or wet areas.

Soot

Racks should not be installed near smoke sources or powder layers.

Table 2 Electric and electrical power

Category

Requirement

Power supply availability

≥ 99.982% (no more than 1.6 hours of downtime per year)

24/7 power supply

Edge sites should always be on if there is power supply in the equipment room. Do not power off edge sites daily or periodically.

Mains supply

Dual-channel mains power

Rack power supply

  • Power of each channel: ≥ 6 kW
  • Current of each channel: ≥ 32 A
  • Air circuit breakers connected to racks: 220 V power supply, 1 pole, ≥ 32 A current
  • Power supply: 220 V AC, 230 V AC, or 240 V AC, 1 PH

Industrial connector

Each cable tray at the rear of racks must be equipped with industrial female connectors. It is recommended that the cable tray is installed at the top of racks. If the cable tray is installed on the bottom of racks, record the information for subsequent evaluation.

Industrial connector specifications: IP44 connectors (2P+E) that comply with IEC60309 requirements must be used. Female connectors must be installed in the equipment room, and male connectors (with 3 x 6 mm2 cables) must be installed on racks. Connectors can be used for devices with 32 A/220 V power supply.

UPS

  • 2N redundancy is required for UPSs.
  • UPSs can provide power supply for at least 15 minutes.

Ground cable of racks

There must be ground copper bars at the rear (top or bottom) of racks, and two screw holes must be reserved for each rack.

Ground bars cannot exceed 30 m and must be securely connected to the ground grid in the equipment room. You can use galvanized flat steel with a cross-sectional area of 40 x 4 mm2 or larger or a cable with a cross-sectional area of 95 mm2 or larger. The flat steel or cable must be insulated, corrosion-proof, and free of any damaged points, and its exposed part must be protected against mechanical damage.

The equipment room must use joint grounding. The working ground and the protection ground must share the same ground with the lightning-proof ground. The ground resistance must be less than 10 Ω or meet the requirements of local standards. Each rack has a proper ground point and equipotential grounding is used between racks.

Rack Space

Table 3 Rack installation

Category

Requirement

Cabling

Overhead cabling is recommended. The distance between the cable tray or fiber trough and the top of racks should be less than or equal to 1 m. If the distance is greater than 1 m, record the detailed cabling length.

Floor load bearing

The bearing capacity of the floor is greater than 1,000 kg/m2.

Power

The minimum power for a single rack is 6,000 W.

Installation position

The installation position must be able to accommodate a rack with the dimensions of 2000 mm x 600 mm x 1200 mm (H x W x D).

The cold aisle must be 1.2 m or larger in width, and the hot aisle must be 0.6 m or larger in width.

Expandable space

Sufficient space should be reserved if capacity expansion is required later.

Cabling between the edge site and on-premises network devices

Check whether there is a cable trough on the top of racks and whether multi-mode optical fiber can be used for cabling between racks and on-premises network devices. Record the cabling length.

Rack Transportation

Table 4 Rack unloading

Category

Requirement

Unloading area

  • The unloading area meets height and ramp requirements for an 8-ton freight carrier truck.
  • The working space must be of sufficient width, depth, and height to allow unloading of racks. The depth must be greater than 6.5 m.

Unloading route

Any platforms, hallway, elevators, doorways, turns, and ramps from the delivery site to the final resting position must have sufficient clearance.

  • The road surface for trucks passes must be level (roughness: ±3 cm).
  • There are no thresholds or steps along the route from the unpacking room to the rack installation position.
  • There is no height difference along the route. If the ground is not level, the incline must be less than 8 degrees.

Freight elevator

  • If racks are transported with packaging, the freight elevator door must be at least 2.4 m high and 1.5 m wide. If racks are transported without packaging, the freight elevator door must be at least 2 m high.
  • The clearance between the car-platform sill and the hoistway edge of any landing sill must be less than 20 mm.
  • The load-bearing capacity of the freight elevator must be greater than or equal to 2 tons.
  • There must be at least two freight elevators in the equipment room.

On-Premises Network

Learning about the networking requirements can help you quickly understand the requirements for on-premises networks.

Table 5 Requirements for on-premises networks

Category

Requirement

Brand and model of network switches

The brand and model of network switches connected to racks can be selected as needed.

Number of switches

One or two switches (If there is only one switch, evaluate the risk of high availability. If there are two racks, stack the switches.)

Optical modules on switches

Multi-mode or single-mode optical modules must be used.

Electrical ports are not supported.

Rate and number of optical ports on switches

  • Optical port rate: 100 Gbit/s (recommended), 40 Gbit/s, 25 Gbit/s, or 10 Gbit/s
  • Number of ports: 2, 4 (recommended), 8, or 14 (The number of ports varies according to the rate of the optical port.)

Public IP address

Four public IP addresses are required for connecting the edge site to the cloud (IP addresses (2), (3), and (4) described in Table 3)

(2) indicates two public IP addresses and (4) indicates one public IP address you purchase from a carrier, and (3) indicates one IP address you purchase on the EIP console.

Public network egress

At least 200 Mbit/s is required (for management IP addresses and interconnection IP addresses).

If you use other connections, ensure that they meet the requirements for network communications between edge sites and the cloud.

To avoid network quality problems, do not share the existing public network egress with CloudPond. If these IP addresses need to be shared, ensure that there are no network conflicts.

Public IP address availability

Public IP addresses must be 24/7 available. The network interruption cannot exceed 24 hours.

Network latency

The network latency between the edge site and the cloud must be less than or equal to 150 ms.

Sitemizi ve deneyiminizi iyileştirmek için çerezleri kullanırız. Sitemizde tarama yapmaya devam ederek çerez politikamızı kabul etmiş olursunuz. Daha fazla bilgi edinin

Feedback

Feedback

Feedback

0/500

Selected Content

Submit selected content with the feedback