Updated on 2026-11-12 GMT+08:00

Admin Operations

Scenario

The admin is the project owner or development owner of a workspace in enterprise mode. Before a team can start data development, the admin needs to complete preparations such as data lake preparation, environment isolation configuration, and user authorization, to set up a work environment for developers, deployers, and operators.

Procedure

Operation

Description

Guidance

Making preparations

Prepare data lakes and prepare and synchronize data.

Preparing Data Lakes and Prepare and synchronize data.

Creating data connections in enterprise mode

Create data connections for all data lake engines. For clustered data sources, you can create data connections for both the development and production environments.

Creating a DataArts Studio Data Connection

Configuring environment isolation for a workspace in enterprise mode

Configure DLI queues, database mappings, and CDM clusters in the development and production environments.

Configuring Environment Isolation

Authorizing users to use DataArts Studio

Create an IAM user with the DAYU User permissions for each project member and assign appropriate workspace roles to the user.

Authorizing Users to Use DataArts Studio

Preparing Data Lakes

In enterprise mode, the development environment and production environment need to be isolated. Therefore, you need to prepare two data lake services, one for the production environment and the other for the development environment.
  • For clustered data sources, such as MRS , RDS, MySQL, Oracle, DIS, ECS, and DWS, you can create data connections in Management Center to distinguish data lake services in the development environment from those in the production environment. The data lake is automatically switched during development and production. Therefore, you need to prepare two data lake services (clusters) that have the same version, specifications, components, region, VPC, subnet, and other related configurations.

    For example, if your data lake service is an MRS cluster, you need to prepare two MRS clusters with the same version, specifications, components, region, VPC, and subnet. Any change to the configuration of one of the MRS clusters must be synchronized to the other cluster.

  • For serverless services (such as DLI), you can configure the mapping between data lake services in the production environment and those in the development environment through environment isolation in Management Center. The data lake is automatically switched during development and production. Therefore, you need to prepare two sets of queue and database resources in the serverless data lake service. You are advised to distinguish them by name suffix.
  • If DWS, MRS Hive, and MRS Spark data sources use the same cluster, you must configure database mapping on the Configure Data Source Resource Mapping page to isolate the development and production environments.