To MongoDB
| Type | Parameter | Description | Example Value |
|---|---|---|---|
| Basic parameters | Database | Database name. Click the icon next to the text box. The dialog box for selecting the database is displayed. | default |
| Collection Name | Name of the collection to which data will be written. Click the icon next to the text box to enter the page for selecting a collection. This parameter can be configured as a macro variable of date and time and a path name can contain multiple macro variables. When the macro variable of date and time works with a scheduled job, the incremental data can be synchronized periodically. For details, see Incremental Synchronization Using the Macro Variables of Date and Time. NOTE: If you have configured a macro variable of date and time and schedule a CDM job through DataArts Studio DataArts Factory, the system replaces the macro variable of date and time with (Planned start time of the data development job – Offset) rather than (Actual start time of the CDM job – Offset). | table | |
| Advanced attributes | Behavior | Mode for writing data to the destination.
| Insert |
| Pre-import SQL Statement | Operations required before the migration job starts. Only remove and drop operations are supported.
| {"type":"remove","json":"{Pid:'2'}"} |
What is your overall rating for this page?
Thank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot