DLI Connection Parameters
Parameter | Mandatory | Description |
|---|---|---|
Data Connection Type | Yes | DLI is selected by default and cannot be changed. |
Name | Yes | Name of the data connection to create. Data connection names can contain a maximum of 100 characters. They can contain only letters, digits, underscores (_), and hyphens (-). |
Description | No | A description which can help identify the data connection more easily. It can contain a maximum of 100 characters. |
Tag | No | Attribute of the data connection to create. Tags make management easier. NOTE: The tag name can contain only letters, digits, and underscores (_) and cannot start with an underscore (_) or contain more than 100 characters. |
Applicable Modules | Yes | Select the modules for which this connection is available. NOTE:
|
Data Source Authentication and Other Function Configuration | ||
Real-time Metadata Synchronization | Yes | When real-time metadata synchronization is enabled, the metadata of DLI is synchronized to the Data Map component in real time. You are advised to enable this function. NOTE: Whether real-time metadata synchronization is enabled depends on whether this function is enabled for the latest DLI connection in the DataArts Studio instance. That is, if real-time synchronization is disabled or enabled for a DLI connection, this function is also disabled or enabled for all DLI connections. For example, if there is a DLI connection in a workspace of a DataArts Studio instance and another DLI connection in another workspace, and real-time metadata synchronization is enabled for the connection that is created first and disabled for the connection that is created later, then real-time metadata synchronization is disabled for DLI. If real-time metadata synchronization is disabled for the connection that is created first and enabled for the connection that is created later, then real-time metadata synchronization is enabled for DLI. |
Metadata Collection Scope | No | Databases and data tables whose metadata will be synchronized in real time. If this parameter is not set, all metadata will be synchronized. The value can be in either of the following formats:
Examples:
|
Basic and Network Connectivity Configuration | ||
Project ID | No | This parameter is displayed when DataArts Migration is selected for Applicable Modules. Project ID in the region where DLI resides A project is a group of tenant resources, and an account ID corresponds to the current account. The IAM ID corresponds to the current user. You can view the project IDs, account IDs, and user IDs in different regions on the corresponding pages.
|
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot
