Updated on 2024-05-21 GMT+08:00

Reviewing an SF to Be Baselined

You can initiate a baseline review (BR) for an SF. After the review is approved, the SF can be used as the baseline.

Prerequisites

  • A project has been created.
  • An SF has been created.

Procedure

  1. Select SFs that require BR in the SF list. Multiple SFs can be selected.
  2. Click Baseline Review in the operation menu at the bottom of the page. The BR page for creating a BR is displayed.
  3. Enter BR information.

    By default, the Baseline Object is the SF for which the BR is initiated.

  4. Click Submit. The Review page is displayed.

    Choose Review > Baseline Review to view the new baseline review.

Follow-Up Operations

Track the approval progress of the BR ticket. The SF can be baselined only when the BR state changes to Approved.

Related Operations

Reviewing a BR