Introduction to Status Transition

The lifecycle of an R&D requirement consists of the Initial, Analyzing, Developing, Testing, and Completed states. Figure 1 shows the complete status transition process.

Figure 1 R&D requirement status transition flowchart

Table 1 describes operations in each state.

Table 1 Operation description

State

Description

Operation

Initial

When an R&D requirement is created, the state is Initial by default.

  1. Creating R&D Requirements
  2. Breaking Down R&D Requirements
  3. Initial IR

Analyzing

After the R&D requirement in the Initial state is handled, the state changes to Analyzing.

Analyzing an IR

Developing

After the R&D requirement is analyzed, the state changes to Developing.

Developing an IR

Testing

After the development personnel complete the R&D requirement development, the state changes to Testing.

Testing an IR

Completed

After the R&D requirement passes the test, the state changes to Completed.

-