Synchronization Integration
Configuring synchronization integration includes Parameters and General. When the integration mode is Event callback, the operation also includes Full Synchronization.
Configuring Parameters
- Log in to the administrator portal.
- On the top navigation bar, choose Resources > Applications.
- Click an application to go to the information page.
- On the General Information page, click next to Synchronization Integration to select an appropriate integration mode, and then click Save.
- On the displayed page, click Configure next to Synchronization Integration to set parameters, and then click Save. Configure the parameters based on synchronization integration modes.
- For details about configuring integration parameters for event callback synchronization, see Configuring Event Callback.
- For details about SCIM-based integration parameters, see Synchronization Configuration.
- For details about LDAP synchronization parameters, see Synchronization Configuration.
General Configuration
General Configuration: indicates the mapping during synchronization.
On the Synchronization Integration page, click General to enable it. The configuration mapping includes deleting and disabling an account and organization.
- Delete an account
After an application account is deleted from OneAccess, the downstream application system determines the operation (deleting and disabling accounts and asynchronization) to be performed based on the configuration.
- Delete an organization
After an organization is deleted from OneAccess, the downstream application system determines the operation (deleting and disabling organizations, and asynchronization) to be performed based on the configuration.
- Disable an account
After an application account is disabled in OneAccess, the downstream application system determines the operation (disabling accounts, and asynchronization) to be performed based on the configuration.
- Disable an organization
After an organization is disabled in OneAccess, the downstream application system determines the operation (disabling organizations, and asynchronization) to be performed based on the configuration.
Full Synchronization
If the integration mode is event callback, full synchronization can be implemented. For details, see Full Synchronization.
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot