Updated on 2024-12-25 GMT+08:00

Stopping a DR Task

This section describes how to stop the DR relationship between the primary and DR instances.

Precautions

  • After the DR task is stopped, you need to create a new DR task if needed.
  • After the DR task is complete, the network configuration will be automatically cleared. If you need to set up a new DR relationship, go to the instance details page to reset the configuration.
  • In the streaming DR scenario, if instance B is promoted to the primary instance and removes the DR relationship with instance A, instance A does not know that the relationship has been deleted and can successfully remove the DR relationship with instance B only when instance B is available. If instance B is abnormal, you need to manually skip the removal step related to instance B when deleting the relationship on the instance A side.

Procedure

  1. Log in to the management console.
  2. Click in the upper left corner and select a region and project.
  3. Click in the upper left corner of the page and choose Databases > GaussDB.
  4. In the navigation pane on the left, choose Disaster Recovery. Locate a DR task and click Stop in the Operation column.
  5. In the displayed dialog box, select Stop task and click Yes.