Updated on 2024-06-07 GMT+08:00

From DDM to DDM

Supported Source and Destination Databases

Table 1 Supported databases

Source DB

Destination DB

DDM instances

DDM instances

Database Account Permission Requirements

To start a synchronization task, the source and destination database users must meet the requirements in the following table. Different types of synchronization tasks require different permissions. For details, see Table 2. DRS automatically checks the database account permissions in the pre-check phase and provides handling suggestions.

Table 2 Database account permission

Type

Full+Incremental

Source database user

  • The user of the source DDM database must have at least one permission, for example, SELECT.
  • The DDM sharded database user must have the SELECT, SHOW VIEW, EVENT, LOCK TABLES, REPLICATION SLAVE and REPLICATION CLIENT permissions.

Destination database user

The user must have the following permissions: CREATE, DROP, ALTER, INDEX, INSERT, DELETE, UPDATE, and SELECT. In addition, grant the SELECT permission on all tables. The DDM destination database user must have permissions on the database to be synchronized.

  • You are advised to create an independent database account for DRS task connection to prevent task failures caused by database account password modification.
  • After changing the account passwords for the source and destination databases, modify the connection information in the DRS task as soon as possible to prevent automatic retry after a task failure. Automatic retry will lock the database accounts.

Supported Synchronization Objects

Table 3 lists the objects that can be synchronized in different scenarios. DRS will automatically check the objects you selected before the synchronization.

Table 3 Supported synchronization objects

Type

Precautions

Synchronization objects

  • Full synchronization supports the synchronization of data, table structures, and indexes.
  • Only MyISAM and InnoDB tables can be synchronized.
  • The source database cannot contain tables whose sharding keys are of the timestamp type.

Precautions

To ensure tasks can run normally, DRS provides automatic pre-check. Before starting a DRS task, DRS checks the configurations and conditions of the source and destination databases. For details about the main check items and handling suggestions, see Pre-check Items. In addition to the pre-check items, you need to pay attention to the items listed in Table 4.

Table 4 Precautions

Type

Restrictions

Restrictions on the source database

Enable skip-name-resolve for the source sharded database to reduce the possibility of connection timeout.

Use restrictions

General

  • During the task startup or full synchronization, you are not advised to perform DDL operations, such as deletion, on the source database. Otherwise, the synchronization may fail.
  • During synchronization, do not modify or delete the usernames, passwords, permissions, or ports of the source and destination databases.
  • During synchronization, do not modify the table structure to be synchronized in the source database.
  • During the synchronization, do not change the sharding key of a table on the source DDM instance, or change an unsharded or broadcast table to a sharded table, or change a sharded table to an unsharded or broadcast table.

Incremental synchronization phase

  • The source database cannot be restored.
  • Some DDL statements are supported, including ADD COLUMN, CREATE TABLE, CREATE INDEX, DROP INDEX, RENAME INDEX and ADD INDEX.
  • Perform DDL operations on the same table or column during off-peak hours at an interval of more than 1 minute.

Troubleshooting

  • If any problem occurs during task creation, startup, full synchronization, incremental synchronization, or completion, rectify the fault by referring to Troubleshooting.

Other restrictions

  • If the data types are incompatible, the synchronization may fail.
  • If the source database contains non-standard floating-point data and the data can be written in loose mode but cannot be written in strict mode, there may be data inconsistency during synchronization.
  • If a physically generated column in a table is generated based on a time type, the data in the column may be inconsistent.
  • The destination table can contain more columns than the source table. However, the following failures must be avoided:
    • Assume that extra columns on the destination cannot be null or have default values. If newly inserted data records are synchronized from the source to the destination, the extra columns will become null, which does not meet the requirements of the destination and will cause the task to fail.
    • Assume that extra columns on the destination must be fixed at a default value and have a unique constraint. If newly inserted data records are synchronized from the source to the destination, the extra columns will contain multiple default values. That does not meet the unique constraint of the destination and will cause the task to fail.
  • After a task is created, you cannot add schemas to the source database or modify the old schema to associate with the new RDS DB instance. Otherwise, data cannot be synchronized or the task fails.
  • Create a schema for the destination database in advance.
  • Ensure that the destination database is empty before starting the synchronization. Otherwise, data in the destination may be overwritten during incremental synchronization.
  • If the destination instance uses columns of the TIMESTAMP or DATETIME data type as its sharding key, the seconds precision of the column is removed after the synchronization.
  • The AUTO_INCREMENT value of a table in the destination cannot be less than that of a table in the source.
  • During an incremental synchronization of table-level objects, renaming tables is not recommended.
  • When editing a task, do not import a lot of data to the newly-added table. You are advised to edit the task during off-peak hours.
  • If the destination DDM version is later than 3.0.4.1, DRS automatically updates the start value of the DDM sequence when the task is complete.

Procedure

  1. On the Data Synchronization Management page, click Create Synchronization Task.
  2. On the Create Synchronization Instance page, select a region and project, specify the task name, description, and the synchronization instance details, and click Create Now.

    • Task information description
      Figure 1 Synchronization task information
      Table 5 Task information

      Parameter

      Description

      Region

      The region where the replication instance is deployed. You can change the region.

      Project

      The project corresponds to the current region and can be changed.

      Task Name

      The task name must start with a letter and consist of 4 to 50 characters. It can contain only letters, digits, hyphens (-), and underscores (_).

      Description

      The description consists of a maximum of 256 characters and cannot contain special characters !=<>'&"\

    • Synchronization instance information
      Figure 2 Synchronization instance information
      Table 6 Synchronization instance settings

      Parameter

      Description

      Data Flow

      Select To the cloud.

      Source DB Engine

      Select DDM.

      Destination DB Engine

      Select DDM.

      Network Type

      Public network is used as an example. Available options: Public network, VPC, VPN or Direct Connect

      • VPC is suitable for data synchronization between cloud databases of the same account in the same region.
      • Public network is suitable for data synchronization from on-premises or external cloud databases to the destination databases bound with an EIP.
      • VPN or Direct Connect is suitable for synchronization of data between on-premises databases and cloud databases, between cloud databases of different accounts in the same region, or between cloud databases across regions.

      Destination DB Instance

      The DDM instance you created.

      Synchronization Instance Subnet

      Select the subnet where the synchronization instance is located. You can also click View Subnets to go to the network console to view the subnet where the instance resides.

      By default, the DRS instance and the destination DB instance are in the same subnet. You need to select the subnet where the DRS instance resides, and there are available IP addresses for the subnet. To ensure that the synchronization instance is successfully created, only subnets with DHCP enabled are displayed.

      Synchronization Mode

      The synchronization mode supported by a DRS task. Full+Incremental is used as an example. For details about the underlying working principles for full or incremental synchronization, see Product Architecture and Function Principles.

      • Full+Incremental

        This synchronization mode allows you to synchronize data in real time. After a full synchronization initializes the destination database, an incremental synchronization parses logs to ensure data consistency between the source and destination databases.

      NOTE:

      If you select Full+Incremental, data generated during the full synchronization will be continuously synchronized to the destination database, and the source remains accessible.

      Source DB Instance Quantity

      Specifies the number of DB instances bound to the source DDM database. The default value is 2. The value ranges from 1 to 64. Set this parameter based on the site requirements.

      Specify EIP

      This parameter is available when you select Public network for Network Type. Select an EIP to be bound to the DRS instance. DRS will automatically bind the specified EIP to the DRS instance and unbind the EIP after the task is complete. The number of specified EIPs must be the consistent with that of DB instances.

      For details about the data transfer fee generated using a public network, see EIP Price Calculator.

    • Task type
      Figure 3 Task type
      Table 7 Task type information

      Parameter

      Description

      Specifications

      DRS instance specifications. Different specifications have different performance upper limits. For details, see Real-Time Synchronization.

      NOTE:

      DRS allows you to upgrade specifications only for single-AZ synchronization tasks. Task specifications cannot be downgraded. For details, see Changing Specifications.

      AZ

      Select the AZ where you want to create the DRS task. Selecting the one housing the source or destination database can provide better performance.

    • Enterprise Project and Tags
      Figure 4 Enterprise projects and tags
      Table 8 Enterprise Project and Tags

      Parameter

      Description

      Enterprise Project

      An enterprise project you would like to use to centrally manage your cloud resources and members. Select an enterprise project from the drop-down list. The default project is default.

      For more information about enterprise project, see Enterprise Management User Guide.

      To customize an enterprise project, click Enterprise in the upper right corner of the console. The Enterprise Project Management Service page is displayed. For details, see Creating an Enterprise Project in Enterprise Management User Guide.

      Tags

      • Tags a task. This configuration is optional. Adding tags helps you better identify and manage your tasks. Each task can have up to 20 tags.
      • If your organization has configured tag policies for DRS, add tags to tasks based on the policies. If a tag does not comply with the policies, task creation may fail. Contact your organization administrator to learn more about tag policies.
      • After a task is created, you can view its tag details on the Tags tab. For details, see Tag Management.

    If a task fails to be created, DRS retains the task for three days by default. After three days, the task automatically stops.

  3. On the Configure Source and Destination Databases page, wait until the synchronization instance is created. Then, specify source and destination database information and click Test Connection for both the source and destination databases to check whether they have been connected to the synchronization instance. After the connection tests are successful, select the check box before the agreement and click Next.

    Figure 5 Source database information
    Table 9 Source database settings

    Parameter

    Description

    Middleware IP Address or Domain Name

    The IP address or domain name of the source DDM middleware.

    Port

    The port of the source DDM middleware. Value range: 1 to 65535

    Middleware Username

    The username of the source DDM instance.

    Middleware Password

    The password for the source DDM instance username.

    SSL Connection

    SSL encrypts the connections between the source and destination databases. If SSL is enabled, upload the SSL CA root certificate.

    NOTE:
    • The maximum size of a single certificate file that can be uploaded is 500 KB.
    • If SSL is disabled, your data may be at risk.

    DB Instance

    The sharded database details.

    The IP address, domain name, username, and password of the source database are encrypted and stored in DRS, and will be cleared after the task is deleted.

    Figure 6 Destination database information
    Table 10 Destination database settings

    Parameter

    Description

    DB Instance Name

    The DDM instance you selected when you create the synchronization task. The instance name cannot be changed.

    Database Username

    The username for accessing the destination database.

    Database Password

    The database username and password are encrypted and stored in the system and will be cleared after the task is deleted.

  4. On the Set Synchronization Task page, select the objects to be synchronized, and then click Next.

    Figure 7 Synchronization Mode

    Table 11 Synchronization mode and object

    Parameter

    Description

    Flow Control

    You can choose whether to control the flow. Flow Control takes effect in the full phase only.

    • Yes

      You can customize the maximum synchronization speed. During the full synchronization, the synchronization speed of each task (or each subtask in multi-task mode) does not exceed the value of this parameter.

      In addition, you can set the time range based on your service requirements. The traffic rate setting usually includes setting of a rate limiting time period and a traffic rate value. Flow can be controlled all day or during specific time ranges. The default value is Always. A maximum of three time ranges can be set, and they cannot overlap.

      The flow rate must be set based on the service scenario and cannot exceed 9,999 MB/s.

      Figure 8 Flow control
    • No
      The synchronization speed is not limited and the outbound bandwidth of the source database is maximally used, which will increase the read burden on the source database. For example, if the outbound bandwidth of the source database is 100 MB/s and 80% bandwidth is used, the I/O consumption on the source database is 80 MB/s.
      NOTE:
      • The flow control mode takes effect only in the full synchronization phase.
      • You can also change the flow control mode after creating a task. For details, see Modifying the Flow Control Mode.

    Incremental Conflict Policy

    The conflict policy refers to the conflict handling policy during incremental synchronization. By default, conflicts in the full synchronization phase are ignored. Select any of the following conflict policies:

    • Ignore

      The system will skip the conflicting data and continue the subsequent synchronization process. If you select Ignore, data in the source database may be inconsistent with that in the destination database.

    • Overwrite

      Conflicting data will be overwritten.

    Synchronize DML

    Select the DML operations to be synchronized. By default, all DML operations are selected.

    If you do not select Delete, DELETE statements in the incremental data of the source database will not be synchronized, which may cause a data inconsistency. As a result, there may be a data conflict or the task may fail.

    Synchronization Object

    The left pane displays the source database objects, and the right pane displays the selected objects. DRS supports table-level synchronization. You can select data for synchronization based on your service requirements.

    If the synchronization objects in source and destination databases have different names, you can map the source object name to the destination one. For details, see Changing Object Names (Mapping Object Names).

    NOTE:
    • To quickly select the desired database objects, you can use the search function.
    • If there are changes made to the source databases or objects, click in the upper right corner to update the objects to be synchronized.
    • If an object name contains spaces, the spaces before and after the object name are not displayed. If there are two or more consecutive spaces in the middle of the object name, only one space is displayed.
    • The name of the selected synchronization object cannot contain spaces.

  5. On the Check Task page, check the synchronization task.

    • If any check fails, review the cause and rectify the fault. After the fault is rectified, click Check Again.

      For details about how to handle check failures, see Solutions to Failed Check Items in Data Replication Service User Guide.

    • If all check items are successful, click Next.

      You can proceed to the next step only when all checks are successful. If there are any items that require confirmation, view and confirm the details first before proceeding to the next step.

  6. On the displayed page, specify Start Time, Send Notifications, SMN Topic, Delay Threshold (s), and Stop Abnormal Tasks After, confirm that the configured information is correct, select the check box before the agreement, and click Submit to submit the task.

    Figure 9 Task startup settings

    Table 12 Task startup settings

    Parameter

    Description

    Start Time

    Set Start Time to Start upon task creation or Start at a specified time based on site requirements.

    NOTE:

    After a synchronization task is started, the performance of the source and destination databases may be affected. You are advised to start a synchronization task during off-peak hours.

    Send Notifications

    This parameter is optional. After enabled, select a SMN topic. If the status, latency metric, or data of the migration task is abnormal, DRS will send you a notification.

    SMN Topic

    This parameter is available only after you enable Send Notifications and create a topic on the SMN console and add a subscriber.

    For details, see Simple Message Notification User Guide.

    Delay Threshold (s)

    During an incremental synchronization, a synchronization delay indicates a time difference (in seconds) of synchronization between the source and destination database.

    If the synchronization delay exceeds the threshold you specify, DRS will send alarms to the specified recipients. The value ranges from 0 to 3,600. To avoid repeated alarms caused by the fluctuation of delay, an alarm is sent only after the delay has exceeded the threshold for six minutes.

    NOTE:
    • If the delay threshold is set to 0, no notifications will be sent to the recipient.
    • In the early stages of an incremental synchronization, the synchronization delay is long because a large quantity of data is awaiting synchronization. In this case, no notifications will be sent.
    • Before setting the delay threshold, enable Send Notifications.

    Data Exception Notification

    This parameter is optional. After enabled, DRS will send a notification if the task data is abnormal.

    Stop Abnormal Tasks After

    Number of days after which an abnormal task is automatically stopped. The value must range from 14 to 100. The default value is 14.

    NOTE:
    • You can set this parameter only for pay-per-use tasks.
    • Tasks in the abnormal state are still charged. If tasks remain in the abnormal state for a long time, they cannot be resumed. Abnormal tasks run longer than the period you set (unit: day) will automatically stop to avoid unnecessary fees.

  7. After the task is submitted, you can view and manage it on the Data Synchronization Management page.

    • You can view the task status. For more information about task status, see Task Statuses.
    • You can click in the upper right corner to view the latest task status.
    • By default, DRS retains a task in the Configuration state for three days. After three days, DRS automatically deletes background resources, but the task status remains unchanged. When you configure the task again, DRS applies for resources for the task again. In this case, the IP address of the DRS instance changes.