Updated on 2022-08-16 GMT+08:00

Stages of Workload Plans

Adding Stages for a Workload Plan

  1. Log in to the GaussDB(DWS) management console.
  2. On the displayed Clusters page, click the name of the target cluster.
  3. Switch to the Workload Management tab page.
  4. Go to the plan details page and click Add in the Plan stage area. On the Add Stage page, enter the stage name and configure the queue information. Confirm the configuration and click OK.

    • You must stop the workload plan when adding a stage. Otherwise, the stage cannot be added.
    • You can add a maximum of 48 stages for each plan.
    • The switchover time of all phases in a plan cannot be the same.

Modifying Stages for a Workload Plan

  1. Log in to the GaussDB(DWS) management console.
  2. On the displayed Clusters page, click the name of the target cluster.
  3. Switch to the Workload Management tab page.
  4. Go to the plan details page and click Modify in the Operation column of the target plan stage.

  5. On the Modify Stage page, you can modify information such as the switchover time and queue configurations.

Manually Switching Stages for a Workload Plan

If a running plan needs to be switched to a stage in advance, you can manually do it.

  1. Log in to the GaussDB(DWS) management console.
  2. On the displayed Clusters page, click the name of the target cluster.
  3. Switch to the Workload Management tab page.
  4. Go to the plan details page, click the Handover button in the plan overview area, and select the target stage.

Deleting Stages for a Workload Plan

  1. Log in to the GaussDB(DWS) management console.
  2. On the displayed Clusters page, click the name of the target cluster.
  3. Switch to the Workload Management tab page.
  4. Go to the plan details page and click Delete in the Operation column of the target plan stage.

You must stop the workload plan when deleting a stage. Otherwise, the stage cannot be deleted.