Updated on 2024-11-04 GMT+08:00

Rolling Back a Graph

You can roll back a GES graph to its source version after a successful upgrade.

  • You can only roll back graphs of version 2.4.4 or later.
  • You can only perform a rollback within 30 days after completing an upgrade.
  • During the rollback, the graph will be unavailable and the data is rolled back to that before the upgrade.

The procedure is as follows:

  1. Log in to the GES management console. In the navigation pane on the left, choose Graph Management.
  2. Select the graph you want to roll back in the graph list, click More in the Operation column, and select Roll Back.

    The Roll Back button is not displayed for graphs that cannot be rolled back.

  3. In the dialog box that appears, view the graph version. If the version is correct, click OK. The status of the graph changes to Rolling back. Once the rollback is complete, the status changes to Running, meaning that the graph is successfully rolled back.