Diese Seite ist in Ihrer lokalen Sprache noch nicht verfügbar. Wir arbeiten daran, weitere Sprachversionen hinzuzufügen. Vielen Dank für Ihre Unterstützung.
Cost Center
Cost Center
- What's New
-
Getting Started
- Getting Started with Cost Center
- Confirming Your Cost Allocation Method
- Using Grouping Tools to View Costs
- Making Cost Analysis to Explore Costs and Usage
- Creating Forecasts and Budgets to Track Costs and Usage
- Enabling Cost Anomaly Detection to Identify Anomalies
- Changing Billing Modes to Optimize Costs
-
User Guide
- Upgrade Description (New Edition)
- About Cost Center
- Overview
- Overview (New Edition)
- Cost Assistant (New Edition)
- Getting Started
- Cost Analysis
- Cost and Usage Forecasting
- Budgets
- Budget Management (New Edition)
- Cost Anomaly Detection
- Cost Optimization
- Savings Plans (in OBT)
- Cost Allocation
- Reports
- Exporting Cost Details
- Preferences
- Export History
- Cost Management for Enterprises
- Permissions
- Quotas and Constraints
- Auditing
- Best Practices
-
FAQs
- Overview
- Accessing Cost Center
-
Cost Analysis
- How Do I View the Costs of My Member Accounts?
- Why Can't I View My Cost History?
- What Are Costs Tagged with "Not Categorized"?
- When Is noTagKey Used?
- Why Can't I Find My Created Tags?
- How Do I View Amortized Costs over a Specific Period?
- What Is Cost Data?
- What Are Amortized Costs?
- Why Are My Costs Negative?
- Budgets
- Cost Optimization
- Cost Tags
-
Cost Categories
- What Is a Cost Category and How Does It Work?
- When Do I Need to Create a Cost Category?
- What Does It Mean by Using Existing Rules for a Cost Category?
- What Is the Default Category?
- Can I Create Nested or Hierarchical Cost Categories?
- What Are Splitting Rules?
- Can I View Cost Splitting Results on Cost Analysis and Budget Management Pages?
- Alert Notifications
- Cost Details Export
On this page
Show all
Viewing Multi-Dimensional Cost Breakdowns
Updated on 2025-02-25 GMT+08:00
- Log in to Cost Center.
- Choose Cost Insights > Cost Analysis.
- Select the preconfigured report Multi-Dimensional MTD Costs.
NOTE:
- The Multi-Dimensional MTD Costs report does not include forecasted costs.
- On the Cost Analysis page, select your query criteria. The cost data within the selected time range will be displayed in the specified dimension.
- Change the display dimensions.
Click Edit and select up to three dimensions.
The following display dimensions are available: Linked Account, Service Type, Enterprise Project, Cost Tags, Cost Categories, Region, and Billing Mode.
NOTE:
- The default display dimensions for multiple accounts are Linked Account, Service Type, and Enterprise Project.
- The default display dimensions for a single account are Service Type, Enterprise Project, and Region.
- View the cost Sankey diagram.
- By default, the MTD original costs are displayed. You can change the time range. This analysis report does not include forecasted costs.
- In the Sankey diagram, you can view your cost breakdowns and flows.
- The branch width of each display dimension is equal to that of the total cost. Each branch represents the cost breakdown in a particular dimension.
- The width of each branch represents costs incurred. The wider the branch, the higher the costs.
- The flow of each branch reflects the cost breakdown in each display dimension.
NOTE:
Up to 10 cost branches can be displayed for each dimension. The 10th branch and later branches are all displayed as Other.
- View cost data in the table.
- Click
in the table to expand multi-dimensional cost data.
- Click Export to export multi-dimensional cost data.
- Click
- Switch cost analysis views.
You can select another analysis view from the drop-down list. For example, you can switch among Favorite Reports, Recommended Reports, and Recent Reports.
- Change the display dimensions.
- Click Save As in the right upper corner of the page to save the analyses as reports so that you can easily view cost analyses with the same filters.
Parent topic: Cost Analysis
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.
The system is busy. Please try again later.