From PostgreSQL to GaussDB Primary/Standby
Supported Source and Destination Databases
Source DB |
Destination DB |
---|---|
|
GaussDB primary/standby |
Supported Synchronization Objects
Table 2 lists the objects that can be synchronized in different scenarios. DRS will automatically check the objects you selected before the synchronization.
Database Account Permission Requirements
To start a synchronization task, the source and destination database users must meet the requirements in the following table. Different types of synchronization tasks require different permissions. For details, see Table 3. DRS automatically checks the database account permissions in the pre-check phase and provides handling suggestions.
- You are advised to create an independent database account for DRS task connection to prevent task failures caused by database account password modification.
- After changing the account passwords for the source or destination databases, modify the connection information in the DRS task as soon as possible to prevent automatic retry after a task failure. Automatic retry will lock the database accounts.
Type |
Full |
Full+Incremental |
---|---|---|
Source database user |
Database CONNECT permission, schema USAGE permission, table SELECT permission, and sequence SELECT permission |
The CONNECT permission for databases, the USAGE permission for schemas, the SELECT permission for tables, the SELECT permissions for sequences, the UPDATE, DELETE, and TRUNCATE permissions for tables that do not have primary keys, and the permission to create replication connections
NOTE:
|
Destination database user |
|
Suggestions
- When a task is being started or in the full synchronization phase, do not perform DDL operations on the source database. Otherwise, the task may be abnormal.
- To keep data consistency before and after the synchronization, ensure that no data is written to the destination database during the synchronization.
- The success of database synchronization depends on environment and manual operations. To ensure a smooth synchronization, perform a synchronization trial before you start the synchronization to help you detect and resolve problems in advance.
- Start your synchronization task during off-peak hours. A less active database is easier to synchronize successfully. If the data is fairly static, there is less likely to be any severe performance impacts during the synchronization.
- If network bandwidth is not limited, the query rate of the source database increases by about 50 MB/s during full synchronization, and two to four CPUs are occupied.
- To ensure data consistency, tables to be synchronized without a primary key may be locked for 3s.
- The data being synchronized may be locked by other transactions for a long period of time, resulting in read timeout.
- When DRS concurrently reads data from a database, it will use about 6 to 10 sessions. The impact of the connections on services must be considered.
- If you read a table, especially a large table, during the full migration, the exclusive lock on that table may be blocked.
- For more information about the impact of DRS on databases, see What Is the Impact of DRS on Source and Destination Databases?
- Data-Level Comparison
To obtain accurate comparison results, start data comparison at a specified time point during off-peak hours. If it is needed, select Start at a specified time for Comparison Time. Due to slight time difference and continuous operations on data, data inconsistency may occur, reducing the reliability and validity of the comparison results.
Precautions
The full+incremental synchronization process consists of four phases: task startup, full synchronization, incremental synchronization, and task completion. A single full synchronization task contains three phases. To ensure smooth synchronization, read the following notes before creating a synchronization task.
Type |
Constraints |
---|---|
Starting a task |
|
Full synchronization |
|
Incremental synchronization |
|
Synchronization comparison |
|
Stopping a task |
|
Prerequisites
- You have logged in to the DRS console.
- Your account balance is greater than or equal to $0 USD.
- For details about the DB types and versions supported by real-time synchronization, see Supported Databases.
- If a subaccount is used to create a DRS task, ensure that an agency has been added. To create an agency, see Agency Management.
- You have read Suggestions and Precautions.
Procedure
- On the Data Synchronization Management page, click Create Synchronization Task.
- On the Create Synchronization Instance page, select a region and project, specify the task name, description, and the synchronization instance details, and click Create Now.
- Task information description
Figure 1 Synchronization task information
Table 5 Task and recipient description Parameter
Description
Region
The region where the synchronization instance is deployed. You can change the region.
Project
The project corresponds to the current region and can be changed.
Task Name
The task name must start with a letter and consist of 4 to 50 characters. It can contain only letters, digits, hyphens (-), and underscores (_).
Description
The description consists of a maximum of 256 characters and cannot contain special characters !=<>'&"\
- Synchronization instance details
Figure 2 Synchronization instance details
- Enterprise Projects and Tags
Figure 3 Enterprise projects and tags
Table 7 Enterprise Projects and Tags Parameter
Description
Enterprise Project
An enterprise project you would like to use to centrally manage your Global Accelerator resources. Select an enterprise project from the drop-down list. The default project is default. For more information about enterprise project, see Enterprise Management User Guide.
To customize an enterprise project, click Enterprise in the upper right corner of the console. The Enterprise Management page is displayed. For details, see Creating an Enterprise Project in Enterprise Management User Guide.
Tags
- This setting is optional. Adding tags helps you better identify and manage your tasks. Each task can have up to 10 tags.
- After a task is created, you can view its tag details on the Tags tab. For details, see Tag Management.
If a task fails to be created, DRS retains the task for three days by default. After three days, the task automatically ends.
- Task information description
- On the Configure Source and Destination Databases page, wait until the synchronization instance is created. Then, specify source and destination database information and click Test Connection for both the source and destination databases to check whether they have been connected to the synchronization instance. After the connection tests are successful, select the check box before the agreement and click Next.
Establish the connectivity between the DRS instance and the source and destination databases.
- Network connectivity: Ensure that the source and destination databases accept connections from the IP address of the DRS instance. To access databases over a public network, configure the database to accept connections from the EIP of the DRS instance. To access databases over a VPC, VPN, or Direct Connect network, configure the database to accept connections from the private IP address of the DRS instance.For details, see Network Preparations.
- Account connectivity: Ensure that the source and destination databases allows connections from the DRS instance using the username and password.
The source database can be an ECS database or an RDS instance. Configure parameters based on different scenarios.
- Scenario 1: Databases on an ECS - source database configuration
Figure 4 Self-build on ECS - source database information
Table 8 Self-build on ECS - source database information Parameter
Description
Source Database Type
Select Self-built on ECS.
VPC
A dedicated virtual network in which the source database is located. It isolates networks for different services. You can select an existing VPC or create a VPC.
Subnet
A subnet provides dedicated network resources that are isolated from other networks, improving network security. The subnet must be in the AZ where the source database resides. You need to enable DHCP for creating the source database subnet.
IP Address or Domain Name
The IP address or domain name of the source database.
Port
The port of the source database. Range: 1 – 65535
Database Name
Indicates whether to specify a database. If this option is enabled, enter the database name.
Database Username
The username for accessing the source database.
Database Password
The password for the database username.
SSL Connection
SSL encrypts the connections between the source and destination databases.
The IP address, domain name, username, and password of the source database are encrypted and stored in DRS, and will be cleared after the task is deleted.
- Scenario 2: RDS DB instance - source database configuration
Figure 5 RDS DB instance - source database information
Table 9 RDS DB instance - source database information Parameter
Description
Source Database Type
Select an RDS DB instance.
DB Instance Name
Select the RDS PostgreSQL instance to be synchronized as the source DB instance.
Database Username
The username for accessing the source database.
Database Password
The password for the database username.
Figure 6 Destination database information
Table 10 Destination database settings Parameter
Description
DB Instance Name
The GaussDB primary/standby instance selected during synchronization task creation. This parameter cannot be changed.
Database Username
The username for accessing the destination database.
Database Password
The password for the database username.
The username and password of the source and destination databases are encrypted and stored in the databases and the synchronization instance during the synchronization. After the task is deleted, the username and password are permanently deleted.
- On the Set Synchronization Task page, select the objects to be synchronized, and then click Next.
Figure 7 Synchronization mode
Table 11 Synchronization Object Parameter
Description
Synchronization Object
The left pane displays the source database objects, and the right pane displays the selected objects. DRS supports table-level synchronization. You can select data for synchronization based on your service requirements.
- If the synchronization objects in source and destination databases have different names, you can map the source object name to the destination one. For details, see Mapping Object Names.
- When a schema name or table name is mapped, to prevent conflicts between indexes and constraint names, the original index name in the table is changed to the following format after synchronization: i_+hash value+original index name (which may be truncated)+_key The hash value is calculated based on the original schema name_original table name_original index name. Similarly, the original constraint name on the table is changed to c_ + hash value + original constraint name (which may be truncated) + _key.
NOTE:- To quickly select the desired database objects, you can use the search function.
- If there are changes made to the source databases or objects, click in the upper right corner to update the objects to be synchronized.
- If the object name contains spaces, the spaces before and after the object name are not displayed. If there are multiple spaces between the object name and the object name, only one space is displayed.
- The name of the selected synchronization object cannot contain spaces.
- On the Check Task page, check the synchronization task.
- If any check fails, review the cause and rectify the fault. After the fault is rectified, click Check Again.
For details about how to handle check failures, see Checking Whether the Source Database Is Connected in Data Replication Service User Guide.
- If all check items are successful, click Next.
Figure 8 Pre-check
You can proceed to the next step only when all checks are successful. If there are any items that require confirmation, view and confirm the details first before proceeding to the next step.
- If any check fails, review the cause and rectify the fault. After the fault is rectified, click Check Again.
- On the displayed page, specify Start Time, Send Notification, SMN Topic, Synchronization Delay Threshold, and Stop Abnormal Tasks After, confirm that the configured information is correct, select the check box before the agreement, and click Submit to submit the task.
Figure 9 Task startup settings
Table 12 Task startup settings Parameter
Description
Started Time
Set Start Time to Start upon task creation or Start at a specified time based on site requirements.
NOTE:After a synchronization task is started, the performance of the source and destination databases may be affected. You are advised to start a synchronization task during off-peak hours.
Send Notifications
SMN topic. This parameter is optional. If an exception occurs during synchronization, the system will send a notification to the specified recipients.
SMN Topic
This parameter is available only after you enable Send Notifications and create a topic on the SMN console and add a subscriber.
For details, see Simple Message Notification User Guide.
Synchronization Delay Threshold
During an incremental synchronization, a synchronization delay indicates a time difference (in seconds) of synchronization between the source and destination database.
If the synchronization delay exceeds the threshold you specify, DRS will send alarms to the specified recipients. The value ranges from 0 to 3,600. To avoid repeated alarms caused by the fluctuation of delay, an alarm is sent only after the delay has exceeded the threshold for six minutes.
NOTE:- If the delay threshold is set to 0, no notifications will be sent to the recipient.
- In the early stages of an incremental synchronization, the synchronization delay is long because a large quantity of data is awaiting synchronization. In this case, no notifications will be sent.
- Before setting the delay threshold, enable Send Notification.
Stop Abnormal Tasks After
Number of days after which an abnormal task is automatically stopped. The value must range from 14 to 100. The default value is 14.
NOTE:Tasks in the abnormal state are still charged. If tasks remain in the abnormal state for a long time, they cannot be resumed. Abnormal tasks run longer than the period you set (unit: day) will automatically stop to avoid unnecessary fees.
- After the task is submitted, you can view and manage it on the Data Synchronization Management page.
- You can view the task status. For more information about task status, see Task Statuses.
- You can click in the upper-right corner to view the latest task status.
- By default, DRS retains a task in the Configuration state for three days. After three days, DRS automatically deletes background resources, and the task status remains unchanged. When you restart the task configuration, DRS applies for resources again.
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.