Updated on 2022-09-23 GMT+08:00

Preparations

After derivative metrics are published, you can run or schedule them in the O&M center.

Procedure

  1. On the DataArts Studio console, locate an instance and click Access. On the displayed page, locate a workspace and click DataArts Architecture.
    Figure 1 DataArts Architecture
  2. Choose O&M Center from the left navigation bar. The O&M Center page is displayed as the figure below.
    Figure 2 O&M Center page
  3. Manage your scheduling tasks as required. Refer to the following table for details.

    Operation

    Helpful Link

    Edit

    Refer to step 7 for details.

    Run

    Refer to step 8 for details.

    Stop

    Refer to step 9 for details.

    View

    Refer to step 10 for details.

  4. Edit a scheduling task.
    1. To the right of the task you want to edit, click Set. The Set Scheduling Task dialog box is displayed.
    2. Set parameters as prompt.
    3. Click OK.
  5. Execute a scheduling task.

    Click Execute to the right of the task you want to start.

  6. Stop a scheduling task.

    To the right of the task you want to stop, click Stop.

  7. View a run log.
    1. In the object list, click next to the object name to expand the object. Then, you can view the running instance of the object.
    2. Locate the target instance and click View in the Operation column. On the displayed page, you can view the run logs and results.