Help Center> Direct Connect> Service Overview> Notes and Constraints

Notes and Constraints

Resource

Quota

Remarks

Number of connections that can be created by an account in each region

10

The quota cannot be increased.

Number of virtual interfaces that can be created by an account in each region

50

The quota cannot be increased.

Number of routes for BGP sessions on a virtual interface

100

The quota cannot be increased.

Number of static routes on a virtual interface

50

The quota cannot be increased.

Restrictions on Locations

Before creating a connection, you need to select a location. Pay attention to the following restrictions when you select a location:

  • There may be more than one location in each region. In this case, network latency from each location to different AZs in the region should be less than 5 ms.
  • If your workloads have high requirement for network latency, you can submit a service ticket to consult the location that is the nearest to the AZ where your cloud servers reside.

Product Use Restrictions

  • The CIDR block of the VPC cannot overlap with the CIDR block used by the on-premises network.

    The on-premises network cannot use 100.64.0.0/10, 127.0.0.0/8, 169.254.0.0/16, and 224.0.0.0/3 because they are reserved for the VPC service.

  • Currently, 1GE and 10GE single-mode optical ports can transmit data up to 10 km. If you need an optical port that can transmit data for more than 10 km, or you need a 40GE or 100GE port, you need to purchase optical modules by yourself.
  • If you use a Direct Connect connect to access ELB, you must select Source IP hash as the load balancing algorithm and disable sticky sessions for ELB.

Construction Notes

  • Your construction company must comply with the regulations presented by the equipment room carrier and engineers. In case of any violation, the construction cannot be completed.
  • No optical-to-electrical converters can be hosted or installed in the equipment room.
  • Network blocking due to state policies or HUAWEI CLOUD management will delay the construction. In the event of such situation, contact your Direct Connect manager.
  • The equipment room at a location is operated by a telecom carrier or a third party. If there are fees for connecting your leased line to the equipment room or an in-building cable, pay the fees to the equipment room carrier.
  • You need to apply for a Letter of Authorization (LOA) and show the LOA when entering the equipment room for construction.