Updated on 2026-07-27 GMT+08:00

Risk List

The Risks page displays the Risk Score, Asset Sensitivity Level Overview, Top 5 Asset Levels, and risk details of your assets, helping you identify unsafe assets and handle risks in time.

Prerequisites

There are added OBS assets or authorized big data or database assets. For details, see Adding and Authorizing Data Assets in DSC.

Checking the Risk List

  1. Log in to the DSC console.
  2. Click in the upper left corner and select a region or project.
  3. In the navigation pane on the left, choose Risk Assessment > Risks.

    • Risk Score: It shows the Security Score of all your assets. You can click next to Scoring Rules to check the score calculation rule.
    • Asset Sensitization Level Overview: It displays the classification results of sensitive data in your assets.
    • Top 5 Asset Levels: It displays the five asset levels with the most assets.
    • Risk Details:
      1. Select an asset type (OBS, Big Data, or Database) to check the asset list. You can check the Instance, Type/Engine Type, and Security Level.
      2. Click the next to an instance name to expand the risk details of its assets. Based on the provided Policy Baseline, click Modify, Enable Now, or Details to handle a risk. You can click Ignore to ignore the suggestion or the asset. Ignored assets are not counted in the asset score. For more information about policy baseline configuration, see Configuring Security Baselines.
      Figure 1 Risk details