To LakeFormation
| Category | Parameter | Description | Example Value |
|---|---|---|---|
| Basic parameters | Database Name | Database name. Click the icon next to the text box. The dialog box for selecting the database is displayed. | default |
| Table Name | Destination table name. Click the icon next to the text box. The dialog box for selecting the table is displayed. This parameter can be configured as a macro variable of date and time and a path name can contain multiple macro variables. When the macro variable of date and time works with a scheduled job, the incremental data can be synchronized periodically. For details, see Incremental Synchronization Using the Macro Variables of Date and Time. NOTE: If you have configured a macro variable of date and time and schedule a CDM job through DataArts Studio DataArts Factory, the system replaces the macro variable of date and time with (Planned start time of the data development job – Offset) rather than (Actual start time of the CDM job – Offset). | TBL_EXAMPLE | |
| Writing mode | Data writing mode
| LOAD | |
| Partition | This parameter is displayed when Write Mode is set to LOAD_OVERWRITE. It indicates the partition, for example, 2024-01-01 or sun. | year=2020,location=sun | |
| Additional Configuration | Additional configuration parameters | - |
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot