Help Center/
DataArts Studio/
More Documents/
User Guide (Kuala Lumpur Region)/
FAQs/
DataArts Factory
Updated on 2023-06-14 GMT+08:00
DataArts Factory
- How Many Jobs Can Be Created in DataArts Factory? Is There a Limit on the Number of Nodes in a Job?
- Why Is There a Large Difference Between Job Execution Time and Start Time of a Job?
- Will Subsequent Jobs Be Affected If a Job Fails to Be Executed During Scheduling of Dependent Jobs? What Should I Do?
- What Should I Pay Attention to When Using DataArts Studio to Schedule Big Data Services?
- What Are the Differences and Connections Among Environment Variables, Job Parameters, and Script Parameters?
- What Do I Do If Node Error Logs Cannot Be Viewed When a Job Fails?
- What Should I Do If the Agency List Fails to Be Obtained During Agency Configuration?
- How Do I Locate Job Scheduling Nodes with a Large Number?
- Why Cannot Specified Peripheral Resources Be Selected When a Data Connection Is Created in Data Development?
- Why Is There No Job Running Scheduling Log on the Monitor Instance Page After Periodic Scheduling Is Configured for a Job?
- Why Does the GUI Display Only the Failure Result but Not the Specific Error Cause After Hive SQL and Spark SQL Scripts Fail to Be Executed?
- What Do I Do If the Token Is Invalid During the Running of a Data Development Node?
- How Do I View Run Logs After a Job Is Tested?
- Why Does a Job Scheduled by Month Start Running Before the Job Scheduled by Day Is Complete?
- What Should I Do If Invalid Authentication Is Reported When I Run a DLI Script?
- Why Cannot I Select the Desired CDM Cluster in Proxy Mode When Creating a Data Connection?
- Why Is There No Job Running Scheduling Record After Daily Scheduling Is Configured for the Job?
- What Do I Do If No Content Is Displayed in Job Logs?
- Why Do I Fail to Establish a Dependency Between Two Jobs?
- What Should I Do If an Error Is Displayed During DataArts Studio Scheduling: The Job Does Not Have a Submitted Version?
- What Do I Do If an Error Is Displayed During DataArts Studio Scheduling: The Script Associated with Node XXX in the Job Is Not Submitted?
- What Should I Do If a Job Fails to Be Executed After Being Submitted for Scheduling and an Error Displayed: Depend Job [XXX] Is Not Running Or Pause?
- How Do I Create a Database And Data Table? Is the database a data connection?
- Why Is No Result Displayed After an HIVE Task Is Executed?
- Why Does the Last Instance Status On the Monitor Instance page Only Display Succeeded or Failed?
- How Do I Create a Notification for All Jobs?
- How Many Nodes Can Be Executed Concurrently in Each DataArts Studio Version?
- What Is the Priority of the Startup User, Execution User, Workspace Agency, and Job Agency?
Parent topic: FAQs
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
The system is busy. Please try again later.
For any further questions, feel free to contact us through the chatbot.
Chatbot