Node Planning
Before applying for SAP S/4HANA ECSs, evaluate the SAP Application Performance Standard (SAPS) value based on the standard SAP Sizing method. Then apply for the ECSs based on the evaluation results. For details, see SAP Quick Sizer.
For details about the minimum hard disk space, RAM, and minimum software requirements of each component in SAP S/4HANA, see SAP note: 1953429 and SAP Installation Guides.
SAP S/4HANA Node Planning
Follow the descriptions in Table 1 to conduct SAP S/4HANA node planning. HUAWEI CLOUD provides SAP-certified ECSs with various specifications. Configure the actual hardware usage based on the SAP Sizing result.
Item |
Specification |
---|---|
OS |
|
Specification |
m6.2xlarge.8 (8 vCPUs and 64 GB memory) |
Disk |
|
Table 2 describes the specifications of SAP-certified ECSs.
ECS Type |
Flavor |
vCPUs |
Memory (GB) |
---|---|---|---|
Memory-optimized |
m6.large.8 |
2 |
16 |
m6.xlarge.8 |
4 |
32 |
|
m6.2xlarge.8 |
8 |
64 |
|
m6.4xlarge.8 |
16 |
128 |
|
m6.8xlarge.8 |
32 |
256 |
|
General computing-plus |
c6.large.4 |
2 |
8 |
c6.xlarge.4 |
4 |
16 |
|
c6.2xlarge.4 |
8 |
32 |
|
c6.3xlarge.4 |
12 |
48 |
|
c6.4xlarge.4 |
16 |
64 |
|
c6.6xlarge.4 |
24 |
96 |
|
c6.8xlarge.4 |
32 |
128 |
Partition |
Capacity (GB) |
Mounted To |
Description |
---|---|---|---|
sda |
10 |
N/A |
Used as the SBD disk. |
sdb |
80 |
/usr/sap/<SID>/ASCS<##> |
Partition of the active node, which is used to install the ASCS instance. |
sdc |
80 |
/usr/sap/<SID>/ERS<##> |
Partition of the standby node, which is used to install the ERS instance. |
In the cross-AZ HA scenario, three ECSs are required and Internet Small Computer System Interface (iSCSI) is used to create a shared disk for Split Brain Detection (SBD). For details, see Configuring iSCSI (Cross-AZ HA Deployment). The disks used to install the ASCS instance and the ERS instance are provided by the SFS Turbo file system. Table 5 describes the planning of the SFS Turbo file system in the cross-AZ HA scenario.
Name |
Total Capacity (GB) |
Mounted To |
Description |
---|---|---|---|
sapmnt |
100GB |
/sapmnt |
Shared to all nodes in the SAP S/4HANA system |
usrsapsys |
10 |
/usr/sap/<SID>/SYS |
Shared to all nodes in the SAP S/4HANA system |
sapmedia |
100 |
/sapcd |
Shared to all nodes in the SAP S/4HANA system |
Name |
Total Capacity (GB) |
Mounted To |
Description |
---|---|---|---|
sapmnt |
100GB |
/sapmnt |
Shared to all nodes in the SAP S/4HANA system |
usrsapsys |
10 |
/usr/sap/<SID>/SYS |
Shared to all nodes in the SAP S/4HANA system |
sapmedia |
100 |
/sapcd |
Shared to all nodes in the SAP S/4HANA system |
ASCS |
80GB |
/usr/sap/<SID>/ASCS<##> |
Shared to the active node, which is used to install the ASCS instance. |
ERS |
80GB |
/usr/sap/<SID>/ERS<##> |
Shared to the standby node, which is used to install the ERS instance. |
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.See the reply and handling status in My Cloud VOC.
For any further questions, feel free to contact us through the chatbot.
Chatbot