Updated on 2024-08-30 GMT+08:00

Configuring the Number of Concurrently Running Nodes

This section describes how to configure the maximum number of job nodes that can run concurrently in a workspace.

Constraints

The number of concurrently running nodes in the workspace cannot exceed that in the instance.

Procedure

  1. Log in to the DataArts Studio console by following the instructions in Accessing the DataArts Studio Instance Console.
  2. On the DataArts Studio console, locate a workspace and click DataArts Factory.
  3. In the navigation pane, choose Configuration > Configure.
  4. Choose Nodes Concurrently Running.
  5. Set Nodes Concurrently Running in the Workspace. Ensure that the value is less than or equal to the maximum number of nodes that can run concurrently in the DataArts Studio instance.

    Table 1 lists the maximum number of nodes that can run concurrently in the DataArts Studio instance. To view the quota of the job node scheduling times per day, click More of a DataArts Studio instance and select Quota Usage.

    Table 1 Maximum number of nodes that can run concurrently in a DataArts Studio instance

    Job Node Scheduling Times/Day of a DataArts Studio Instance

    Maximum Number of Nodes That Can Run Concurrently in a DataArts Studio Instance

    <=500

    10

    <=5000

    50

    <=20000

    100

    <=40000

    200

    <=80000

    300

    > 80000

    400

    Figure 1 Configuring the number of concurrently running nodes

  6. Click Save.

Viewing the Number of Historical Nodes Concurrently Running

  1. In the navigation pane, choose Configuration > Configure.
  2. Choose Nodes Concurrently Running.
  3. In the Historical Nodes Concurrently Running area, set the time range.
  4. Click OK.

    The maximum time range is 24 hours.