Preparations
Before the migration, ensure that the following preparations are complete:
1. Obtain information about the OS version, network planning and design, and file system of the source system, and generated the delivery LLD of the target system based on the obtained information.
2. Confirm the HANA database version of the source and target systems, and obtain the OS image and installation package of the target database.
3. Ensure that your SMS account has sufficient balance for server creation and renewal.