Help Center/ DataArts Studio/ More Documents/ User Guide (Kuala Lumpur Region)/ FAQs/ DataArts Factory/ What Should I Do If an Error Is Displayed During DataArts Studio Scheduling: The Job Does Not Have a Submitted Version?
Updated on 2022-08-17 GMT+08:00

What Should I Do If an Error Is Displayed During DataArts Studio Scheduling: The Job Does Not Have a Submitted Version?

Symptom

An error is reported when DataArts Studio executes scheduling: The job does not have a submitted version. Submit the job version first.

Cause Analysis

Job scheduling process begins before the version is submitted. As a result, an error is reported during scheduling. Ensure that the job has a submitted version before it is scheduled.

Solutions

  1. Step 1: Submit a job version (not a script).
  2. Step 2: Schedule the job.
Figure 1 Submitting a version