Help Center/ CodeArts PerfTest/ User Guide/ PerfTest Project Management/ Configuring Intelligent Analysis for PerfTest Projects
Updated on 2026-02-12 GMT+08:00

Configuring Intelligent Analysis for PerfTest Projects

Intelligent analysis allows you to add analysis objects to your created test projects. Intelligent analysis is an enhanced capability. You can choose whether or not to configure it based on your requirements.

Currently, CodeArts PerfTest in the AP-Singapore region has been interconnected with APM 2.0, and the APM 1.0 configuration in CodeArts PerfTest is invalid. Use APM 2.0 when setting intelligent analysis.

Prerequisites

  • APM has been enabled, a probe has been deployed, and an application has been generated. For details about how to deploy an APM probe, see Monitoring Java Applications.
  • Application Operations Management (AOM) has been enabled, and a probe has been deployed. For details about AOM Agent deployment, see Host Monitoring.

Creating Analysis Objects

  1. Log in to the CodeArts PerfTest console.
  2. In the navigation pane, choose PerfTest Projects.
  3. Click the name of the PerfTest project to which analysis objects are to be added to go to the details page.
  4. On the Intelligent Analysis tab page, click Add Analysis Object.
  5. In the displayed dialog box, the system automatically generates the analysis object name, but you can change it. Select the analysis object to be added. The analysis object can be either an application group, that is Application Monitor (APM), or a node, that is Node Monitor (AOM). The application group is the monitoring group that is set when APM probes are installed on the application server. The node is the VM where AOM probes are installed.
  6. Click OK after the configuration.
  7. Edit or delete analysis objects.

    • Edit an analysis object: On the Intelligent Analysis tab page, click next to the analysis object to modify and edit it as prompted.

      If an analysis object is associated with a test task, once its parameters are edited, parameters of its associated object in the test task are also changed.

    • Delete an analysis object: On the Intelligent Analysis tab page, click next to the analysis object to delete and delete it as prompted.

      Analysis objects cannot be deleted if they are being used in a test task.