Updated on 2024-10-31 GMT+08:00

IPD-System Device Project Reviews

IPD-system device projects have three review types: change review (CR), baseline review (BR), and general review (GR). They are described in Table 1.

Table 1 Review types

Review Type

Description

Review Object

Change review (CR)

  • Changing the controlled fields of a raw requirement or bug will initiate a change review. The change will be synchronized to the requirement and bug only after the review is approved.
    NOTE:

    The control status of a raw requirement and bug is determined by whether any controlled fields are configured for specific status. A field is deemed under control when a raw requirement or bug is in the specified status.

  • Changing the baselined fields of a system feature or R&D requirement will initiate a change review. The change will be synchronized to the feature and requirement only after the review is approved.

Raw requirements, system features, R&D requirements, and bugs

Baseline review (BR)

To baseline a system feature or R&D requirement, you need to initiate a baseline review. The feature and requirement will be baselined only after the review is approved.

Systems features and R&D requirements

General review (GR)

To review a work item, you can initiate a general review. The work item takes effect only after the review is approved.

Raw requirements, system features, R&D requirements, and bugs