Updated on 2024-05-21 GMT+08:00

Changing Review Bugs

If you find any problems with the bug content when working on the project, you can submit a change request.

Status nodes that can be changed in the responsible project workflow support bug change.

Prerequisites

  • A project has been created.
  • A bug has been created.
  • Controlled fields and status nodes that support editing of controlled fields have been configured for the workflow of the responsible project of the bug.

Procedure

  1. In the bug list, click the name of the bug to be changed. The bug details page is displayed.
  2. Find and edit the marked field.
  3. In the dialog box that is displayed, click OK. The page for creating a CR is displayed.
  4. Enter CR information.

    Change Object: By default, it is the bug to be changed.

    Collaborative Parent Item Change: CRs can be added only when they already exist in the system.

  5. Click Submit. The Review page is displayed.

    Choose Review > Change Review to view the new CR in the change process. The CR state is Pending review by default.

  6. Switch to the Defects tab page.

    A change flag is added to the bug icon that has been changed.

  7. Click the name of the changed bug and switch to the Review tab page. The corresponding CR review form is displayed.

Follow-Up Operations

Track the approval progress of the CR change ticket. Only when the state is END, which means that the CR change ticket has been processed, will the changed content be displayed in the corresponding bug.