Updated on 2025-05-20 GMT+08:00

Creating a Resource Package

Before migrating resource packages, you need to create one. When creating a resource package, you can select dashboards, large screens, intelligent analysis assistants, indicators, datasets, data sources, and embedded analytics. This section describes how to create a resource package.

Notes and Constraints

  • The total size of images in a resource package cannot exceed 20 MB. Any excess will not be exportable or importable.
  • Only administrators can perform resource migration operations.

Procedure

  1. Log in to the DataArts Insight console.
  2. Click in the upper left corner of the management console to select a region. Then, select an enterprise project in the upper right corner.
  3. On the top menu of the console, click Project. On the displayed My Projects page, click the name of the desired project.
  4. In the navigation pane on the left, choose Work Management > Resource Migration. On the displayed page, click Create Resource Package in the upper right corner.
    Figure 1 Creating a resource package

  5. Set resource package parameters.
    Table 1 Parameters

    Parameter

    Description

    Resource package name

    Name of a resource package. The name can contain up to 32 characters. Only letters, numbers, hyphens (-), and underscores (_) are allowed.

    Resource package selection

    The following resource packages are supported: Dashboards, Large Screens, Intelligent Analysis Assistants, Indicators, Datasets, Data Sources, and Embedded Analytics.

    Select the resource package to export and click to move it from Available to Selected.

    NOTE:

    After selecting a resource, other resources associated with it will be exported to the resource package synchronously.

    • For embedded analytics, the types of resources that can be exported synchronously include dashboards, large screens, datasets, indicators, and data sources.
    • For dashboards, intelligent analysis assistants, and large screens, the types of resources that can be exported synchronously include datasets, indicators, and data sources.
    • For datasets, the types of resources that can be exported synchronously include indicators and data sources.
    • The "Correlation Indicator" configuration for indicators in the resource package only retains the indicators that are directly or indirectly associated with the current export.

    Resource Pack Advanced Options

    Once selected, the resource package will carry dataset row-level permissions authorized by user tags.

    Export name

    Name of the exported resource package. The name can contain up to 32 characters. Only letters, numbers, hyphens (-), and underscores (_) are allowed.

  6. Click Save and Export. Once the resource package is created, an xx.zip file is automatically downloaded to the local host.