Updated on 2024-07-05 GMT+08:00

Managing Schedules

You configure schedules so make rules take effect only within the specified time range.

This section describes how to add, copy, and delete a schedule.

Scenario

  • Policy test: Set a validity period for a test policy. During the test, the policy automatically takes effect. After the test is complete, the policy automatically becomes invalid.
  • Public network exposure control: Allow services to open ports to external systems only in a necessary period of time (for example, only during office hours), reducing exposure to the public network as well as security risks.
  • Temporary access: Configure a policy to temporarily allow public network access. The policy will become invalid as scheduled even if you forget to detele it.

Adding a Schedule

  1. Log in to the management console.
  2. Click in the upper left corner of the management console and select a region or project.
  3. In the navigation pane on the left, click and choose Security & Compliance > Cloud Firewall. The Dashboard page will be displayed.
  4. (Optional) Switch firewall instance: Select a firewall from the drop-down list in the upper left corner of the page.
  5. In the navigation tree on the left, choose Access Control > Schedule Management.
  6. Click Add Schedule. Configure parameters in the Add Schedule dialog box.

    Table 1 Schedule parameters

    Parameter

    Description

    Schedule Name

    Name of a user-defined schedule

    Description

    (Optional) Usage and application scenario

    Periodic Schedule

    Add Periodic Schedule

    (Optional) time periods in a week. A rule will take effect in the specified periods every week.

    Absolute Schedule

    Start Time

    Time when a rule takes effect

    End Time

    (Optional) time when a rule expires

  7. Click OK.

Follow-up Operations

To make a schedule take effect, you need to select it in the protection rule. For details, see Adding a Protection Rule.

Related Operations

  • Copying a schedule: In the Operation column of a schedule, click Copy.
  • Deleting a schedule: In the Operation column of a schedule, click Delete.
  • Deleting multiple schedules: Select schedules and click Delete above the list.