Compute
Elastic Cloud Server
Huawei Cloud Flexus
Bare Metal Server
Auto Scaling
Image Management Service
Dedicated Host
FunctionGraph
Cloud Phone Host
Huawei Cloud EulerOS
Networking
Virtual Private Cloud
Elastic IP
Elastic Load Balance
NAT Gateway
Direct Connect
Virtual Private Network
VPC Endpoint
Cloud Connect
Enterprise Router
Enterprise Switch
Global Accelerator
Management & Governance
Cloud Eye
Identity and Access Management
Cloud Trace Service
Resource Formation Service
Tag Management Service
Log Tank Service
Config
OneAccess
Resource Access Manager
Simple Message Notification
Application Performance Management
Application Operations Management
Organizations
Optimization Advisor
IAM Identity Center
Cloud Operations Center
Resource Governance Center
Migration
Server Migration Service
Object Storage Migration Service
Cloud Data Migration
Migration Center
Cloud Ecosystem
KooGallery
Partner Center
User Support
My Account
Billing Center
Cost Center
Resource Center
Enterprise Management
Service Tickets
HUAWEI CLOUD (International) FAQs
ICP Filing
Support Plans
My Credentials
Customer Operation Capabilities
Partner Support Plans
Professional Services
Analytics
MapReduce Service
Data Lake Insight
CloudTable Service
Cloud Search Service
Data Lake Visualization
Data Ingestion Service
GaussDB(DWS)
DataArts Studio
Data Lake Factory
DataArts Lake Formation
IoT
IoT Device Access
Others
Product Pricing Details
System Permissions
Console Quick Start
Common FAQs
Instructions for Associating with a HUAWEI CLOUD Partner
Message Center
Security & Compliance
Security Technologies and Applications
Web Application Firewall
Host Security Service
Cloud Firewall
SecMaster
Anti-DDoS Service
Data Encryption Workshop
Database Security Service
Cloud Bastion Host
Data Security Center
Cloud Certificate Manager
Edge Security
Situation Awareness
Managed Threat Detection
Blockchain
Blockchain Service
Web3 Node Engine Service
Media Services
Media Processing Center
Video On Demand
Live
SparkRTC
MetaStudio
Storage
Object Storage Service
Elastic Volume Service
Cloud Backup and Recovery
Storage Disaster Recovery Service
Scalable File Service Turbo
Scalable File Service
Volume Backup Service
Cloud Server Backup Service
Data Express Service
Dedicated Distributed Storage Service
Containers
Cloud Container Engine
SoftWare Repository for Container
Application Service Mesh
Ubiquitous Cloud Native Service
Cloud Container Instance
Databases
Relational Database Service
Document Database Service
Data Admin Service
Data Replication Service
GeminiDB
GaussDB
Distributed Database Middleware
Database and Application Migration UGO
TaurusDB
Middleware
Distributed Cache Service
API Gateway
Distributed Message Service for Kafka
Distributed Message Service for RabbitMQ
Distributed Message Service for RocketMQ
Cloud Service Engine
Multi-Site High Availability Service
EventGrid
Dedicated Cloud
Dedicated Computing Cluster
Business Applications
Workspace
ROMA Connect
Message & SMS
Domain Name Service
Edge Data Center Management
Meeting
AI
Face Recognition Service
Graph Engine Service
Content Moderation
Image Recognition
Optical Character Recognition
ModelArts
ImageSearch
Conversational Bot Service
Speech Interaction Service
Huawei HiLens
Video Intelligent Analysis Service
Developer Tools
SDK Developer Guide
API Request Signing Guide
Terraform
Koo Command Line Interface
Content Delivery & Edge Computing
Content Delivery Network
Intelligent EdgeFabric
CloudPond
Intelligent EdgeCloud
Solutions
SAP Cloud
High Performance Computing
Developer Services
ServiceStage
CodeArts
CodeArts PerfTest
CodeArts Req
CodeArts Pipeline
CodeArts Build
CodeArts Deploy
CodeArts Artifact
CodeArts TestPlan
CodeArts Check
CodeArts Repo
Cloud Application Engine
MacroVerse aPaaS
KooMessage
KooPhone
KooDrive
On this page

Editing a Migration Task

Updated on 2024-04-11 GMT+08:00

For a migration task that has been created but not started, DRS allows you to edit the configuration information of the task, including the task information, replication instance information, and migration information. For migration tasks in the following statuses, you can edit the tasks again after the replication instances are created:

  • Creating
  • Configuration
    NOTE:

    For a started migration task, modifying the migration objects is not supported.

Prerequisites

  • You have logged in to the DRS console.
  • A migration task has been created.

Method 1

  1. In the task list on the Online Migration Management page, locate the target task and click Edit in the Operation column.
  2. On the Configure Source and Destination Databases page, enter information about the source and destination databases and click Next.
  3. On the Set Task page, select the accounts and objects to be migrated, and click Next.

    Table 1 Migration types and objects

    Parameter

    Description

    Flow Control

    You can choose whether to control the flow.

    • Yes

      You can customize the maximum migration speed.

      In addition, you can set the time range based on your service requirements. The traffic rate setting usually includes setting of a rate limiting time period and a traffic rate value. Flow can be controlled all day or during specific time ranges. The default value is All day. A maximum of three time ranges can be set, and they cannot overlap.

      The flow rate must be set based on the service scenario and cannot exceed 9,999 MB/s.

    • No
      The migration speed is not limited and the outbound bandwidth of the source database is maximally used, which will increase the read burden on the source database. For example, if the outbound bandwidth of the source database is 100 MB/s and 80% bandwidth is used, the I/O consumption on the source database is 80 MB/s.
      NOTE:
      • Flow control mode takes effect only during a full migration.
      • You can also change the flow control mode after creating a task. For details, see Modifying the Flow Control Mode.

    Migrate Incremental Accounts and Permissions

    Indicates whether to migrate incremental accounts and permissions during database migration.
    • Yes

      All incremental accounts and permissions will be migrated. The migration of incremental accounts and permissions may fail because the source and destination database versions and account encryption modes may be different.

    • No

      All incremental accounts and permissions will be filtered out during the migration.

    Migrate Account

    During a database migration, accounts need to be migrated separately.

    There are accounts that can be migrated completely, accounts whose permissions need to be reduced, and accounts that cannot be migrated. You can choose whether to migrate the accounts based on service requirements. If you select Yes, you can select the accounts to be migrated as required.
    • No

      During migration, accounts, permissions, and passwords are not migrated.

    Filter DROP DATABASE

    To reduce the risks involved in data migration, DDL operations can be filtered out. You can choose not to synchronize certain DDL operations.

    • If you select Yes, any database deletion operations performed on the source database are not migrated during data migration.
    • If you select No, related operations are migrated to the destination database during data migration.

    Migrate Object

    The left pane displays the source database objects, and the right pane displays the selected objects. You can choose to migrate all objects, tables, or databases based on your service requirements.

    • All: All objects in the source database are migrated to the destination database. After the migration, the object names will remain the same as those in the source database and cannot be modified.
    • Tables: The selected table-level objects will be migrated.
    • Databases: The selected database-level objects will be migrated.

    If the source database is changed, click in the upper right corner before selecting migration objects to ensure that the objects to be selected are from the changed source database.

    NOTE:
    • If you choose not to migrate all of the databases, the migration may fail because the objects, such as stored procedures and views, in the databases to be migrated may have dependencies on other objects that are not migrated. To prevent migration failure, migrate all of the databases.
    • If the object name contains spaces, the spaces before and after the object name are not displayed. If there are multiple spaces between the object name and the object name, only one space is displayed.
    • The name of the selected migration object cannot contain spaces.
    • To quickly select the desired database objects, you can use the search function.

  4. On the Check Task page, check the migration task.

    • If any check fails, review the cause and rectify the fault. After the fault is rectified, click Check Again.

      For details about how to handle check items that fail to pass the pre-check, see Solutions to Failed Check Items.

    • If the check is complete and the check success rate is 100%, click Next.
      NOTE:

      You can proceed to the next step only when all checks are successful. If there are any items that require confirmation, view and confirm the details first before proceeding to the next step.

  5. On the Confirm Task page, specify Start Time, confirm that the configured information is correct, and click Submit to submit the task.

    NOTE:
    • Set Start Time to Start upon task creation or Start at a specified time based on site requirements.
    • After a migration task is started, the performance of the source and destination databases may be affected. You are advised to start a migration task during off-peak hours.
    • Under specific conditions, the destination database needs to be restarted once during the task startup, which may interrupt database services.

  6. After the task is submitted, view and manage it on the Online Migration Management page.

    • You can view the task status. For more information about task status, see Task Statuses.
    • You can click in the upper-right corner to view the latest task status.

Method 2

  1. On the Online Migration Management page, click the target migration task name in the Task Name/ID column.
  2. On the displayed page, click edit this task to go to the Configure Source and Destination Databases page.
  3. Perform steps 2 to 6.

We use cookies to improve our site and your experience. By continuing to browse our site you accept our cookie policy. Find out more

Feedback

Feedback

Feedback

0/500

Selected Content

Submit selected content with the feedback