Help Center/ Object Storage Migration Service/ FAQs/ Product Consulting/ How Does the System Split a Migration Task Group into Multiple Tasks?
Updated on 2026-07-06 GMT+08:00

How Does the System Split a Migration Task Group into Multiple Tasks?

Splitting Conditions

If there are 50 or more objects in a migration task group and the estimated migration time exceeds 6,000 seconds, it will be split into multiple tasks.

  1. Object count: Each migration task is designed to include at least 50 objects to prevent the creation of too many small tasks.
  2. Migration time estimation: For small objects (≤ 200 KB), the estimated time is 0.002 seconds per object. For large objects (> 200 KB), the estimated transfer rate is 60 MB/s. 6,000 seconds of migration time translates to roughly 350 GB of data or 3 million objects.

When a round of listing (1,000 objects) meets the task creation criteria, the system further checks whether the remaining objects are sufficient to form an additional task.

Remaining Objects

Processing Method

Estimated remaining time ≤ 6,000 seconds OR Number of remaining objects < 50

Include the remaining objects into the current task to avoid creating a task that is too small.

Estimated remaining time > 6,000 seconds AND Number of remaining objects ≥ 50

Create the current task and assign the remaining objects to the next round of listing.

Example

In this example, 10,000 files (100 MB each) are split into three tasks. The following table describes the splitting details.

Round

Accumulated Objects

Estimated Time

Result

1

1,000

1,000 x (100 MB/60 MB) = 1,667 seconds

Less than 6,000 seconds

2

2,000

2000 × 1.67 = 3,334 seconds

Less than 6,000 seconds

3

3,000

3,000 × 1.67 = 5,001 seconds

Less than 6,000 seconds

4

4,000

4,000 × 1.67 = 6,689 seconds

Task 1 created

5

5,000

5,000 × 1.67 = 8,335 seconds

Accumulation continues

...

7

7,000

7,000 × 1.67 = 11,690 seconds

Task 2 created

...

10

10,000

10,000 × 1.67 = 16,700 seconds

Task 3 created