Updated on 2023-01-05 GMT+08:00

Modifying Connection Information

During the synchronization, you may change the password of the source or destination database. As a result, the data synchronization, data comparison, task resuming, resetting, object editing, and stopping may fail. In this case, you need to change the password on the DRS console and resume the task.

You can modify the following synchronization information:

  • Source database password
  • Destination database password

    After the preceding information is changed, the change takes effect immediately, and the data in the destination database is not cleared.

Prerequisites

You have logged in to the DRS console.

Procedure

  1. On the Data Synchronization Management page, click the target synchronization task name in the Task Name/ID column.
  2. On the Basic Information tab, click Modify Connection Details in the Connection Information area.
  3. In the displayed dialog box, change the passwords of the source and destination databases and click OK.