Scenarios

During the full replication, the target server is locked by default and you are not allowed to perform any operations on it. After the migration is complete, the system automatically unlocks the target server. If you need to perform operations on the target server during the migration, unlock the target server first.

Procedure

  1. Log in to the management console.
  2. Click Service List. Under Migration, click Server Migration Service.
  3. In the navigation pane on the left, choose Servers.
  4. Locate the server for which you want to unlock the target server, and choose More > Unlock Target in the Operation column.
  5. In the displayed Unlock Target dialog box, click OK.