Updated on 2024-07-18 GMT+08:00

Handling Manual Check Items

Scenario

There are some manual check items included in baseline inspection. After you finish a manual check, report the check results to SecMaster. The pass rate is calculated based on results from both manual and automatic checks.

This topic describes how to start manual checks in baseline inspection.

Constraints and Limitations

Manual check results must be reported every 7 days as your feedback is valid only for 7 days.

Procedure

  1. Log in to the management console.
  2. Click in the upper part of the page and choose Security > SecMaster.
  3. In the navigation pane on the left, choose Workspaces > Management. In the workspace list, click the name of the target workspace.

    Figure 1 Workspace management page

  4. In the navigation pane on the left, choose Risk Prevention > Baseline Inspection.

    Figure 2 Accessing the baseline inspection page

  5. On the Security Standards tab page, locate the row that contains the check item whose result you need to report to SecMaster manually, click Manual Check in the Operation column.
  6. In the displayed dialog box, select a result and click OK.

    Report manual check results every 7 days as your feedback is valid only for 7 days.