Updated on 2023-06-09 GMT+08:00

Performing a Manual Check

Baseline check items are classified into automatic check items and manual check items. This topic describes how to perform manual check items.

There are some manual check items included in baseline inspection. After you finish a manual check, report the check results to SA. The pass rate is calculated based on results from both manual and automatic checks.

Prerequisites

  • You have completed the check offline.

Constraints and Limitations

Manual check results must be reported every 7 days as your feedback is valid only for 7 days.

Procedure

  1. Log in to the management console.
  2. Click in the upper left corner of the page and choose Security > Situation Awareness.
  3. In the navigation pane on the left, choose Baseline Inspection.
  4. Select the region where the check result to be viewed is located.
  5. In the Operation column of the target manual check item, click Manual Check.
  6. In the displayed dialog box, select a result and click OK.

    Figure 1 Reporting manual check results to SA

    Report manual check results every 7 days as your feedback is valid only for 7 days.