Testing Dual-Connection Automatic Switchovers
Scenario
Perform the dual-connection switchover test before the connections are used for network connectivity.
Function
Dual-connection access ensures high SLA. To achieve this, dual-connection automatic switchover needs to be supported. Before O&M of dual-connection access, you can perform switchover tests on the console to verify connectivity and simplify the delivery process.
- In the switchover test record, if the operation type is displayed as Enable, the shutdown command is executed, and the virtual interface is disabled.
- If the operation type is displayed as Disable, the undo shutdown command is executed, and the virtual interface is enabled.
Prerequisites
There are two connections, with each having a virtual interface associated.
Procedure
- Go to the Virtual Interfaces page.
- Enable the switchover test for the virtual interface associated with one connection, for example, connection 1, and check the connectivity between an ECS and the on-premises data center.
- On the Virtual Interfaces page, click the name of the target virtual interface.
- On the Switchover Test page of the virtual interface, click Switchover Test.
- In the Perform Switchover Test dialog box, enable switchover test and click OK. Figure 1 Enabling switchover test
- Refresh the page. On the Basic Information page of the virtual interface, ensure that its status is Disabled manually.
- Run the ping command on an ECS to verify the connectivity between the ECS and the on-premises data center. If a response packet is received, the switchover test is successful.
- Disable the switchover test for the virtual interface associated with connection 1 to restore access over dual connections.
- On the Switchover Test page of the virtual interface, click Switchover Test.
- In the Perform Switchover Test dialog box, disable switchover test and click OK. Figure 2 Disabling switchover test
- Refresh the page. On the Basic Information page of the virtual interface, ensure that its status is Normal.
- Run the ping command on the ECS to verify the connectivity between the ECS and the on-premises data center. If a response packet is received, the switchover test is successful.
- Repeat steps 2 and 3 to perform a switchover test on the virtual interface associated with connection 2.