MRS MapReduce
Functions
The MRS MapReduce node is used to execute a predefined MapReduce program on MRS.
Parameters
Table 1 and Table 2 describe the parameters of the MRS MapReduce node.
| Parameter | Mandatory | Description | 
|---|---|---|
| Node Name | Yes | Name of a node. The name must contain 1 to 128 characters, including only letters, numbers, underscores (_), hyphens (-), slashes (/), less-than signs (<), and greater-than signs (>). | 
| MRS Cluster Name | Yes | Name of the MRS cluster. 
        To create an MRS cluster, use either of the following methods:
         
 | 
| MapReduce Job Name | Yes | MRS job name. It can contain a maximum of 64 characters. Only letters, digits, hyphens (-), and underscores (_) are allowed. 
         NOTE: 
         The job name cannot contain Chinese characters or more than 64 characters. If the job name does not meet requirements, the MRS job will fail to be submitted. | 
| JAR Package | Yes | Select a JAR package. Before selecting a JAR package, upload the JAR package to the OBS bucket, create a resource on the Manage Resource page, and add the JAR package to the resource management list. For details, see Creating a Resource. | 
| JAR File Parameters | No | Parameters of the JAR package. | 
| Input Data Path | No | Path where the input data resides. | 
| Output Data Path | No | Path where the output data resides. | 
| Parameter | Mandatory | Description | 
|---|---|---|
| Node Status Polling Interval (s) | Yes | How often the system check completeness of the node. The value ranges from 1 to 60 seconds. | 
| Max. Node Execution Duration | Yes | Execution timeout interval for the node. If retry is configured and the execution is not complete within the timeout interval, the node will be executed again. | 
| Retry upon Failure | Yes | Whether to re-execute a node if it fails to be executed. Possible values: 
 | 
| Policy for Handling Subsequent Nodes If the Current Node Fails | Yes | Operation that will be performed if the node fails to be executed. Possible values: 
 | 
| Enable Dry Run | No | If you select this option, the node will not be executed, and a success message will be returned. | 
| Task Groups | No | Select a task group. If you select a task group, you can control the maximum number of concurrent nodes in the task group in a fine-grained manner in scenarios where a job contains multiple nodes, a data patching task is ongoing, or a job is rerunning. | 
Feedback
Was this page helpful?
Provide feedbackThank you very much for your feedback. We will continue working to improve the documentation.
 
     
      