On this page

Show all

Help Center/ DataArts Studio/ FAQs/ DataArts Factory/ How Do I Locate Job Scheduling Nodes with a Large Number?

How Do I Locate Job Scheduling Nodes with a Large Number?

Updated on 2022-09-15 GMT+08:00

If the number of daily executed nodes exceeds the upper limit, it may be caused by frequent job scheduling. Perform the following operations:

  1. In the left navigation tree of Data Development, choose Monitoring > Monitor Instance, select the current day, and view the jobs that are frequently scheduled.
  2. In the left navigation tree of Data Development, choose Monitoring > Monitor Job to check whether the scheduling period of jobs that are frequently scheduled is set properly. If the scheduling period is inappropriate, adjust the scheduling period or stop the scheduling. Generally, the number of minute-level scheduling jobs executed every day exceeds the upper limit.
    Figure 1 Viewing the scheduling period
Feedback

Feedback

Feedback

0/500

Selected Content

Submit selected content with the feedback