Managing Resources Using Applications

Scenario

You can use applications to manage resources that are not created by using applications.

Restrictions and Limitations

Only ECSs in the running or stopped state can be managed currently. Applications created by using templates cannot be used for resource management.

Procedure

  1. Choose Enterprise > Project Management in the upper right corner of the page.

    If the screen resolution is low, choose More > Enterprise > Project Management.

    Figure 1 Project Management

  2. In the navigation pane, choose Application Management > Applications.

    The application list is displayed in the lower part of the page.

  3. Click Manage Resource in the upper right corner of the page.

    The Application Management page is displayed.

  4. Select an ECS.

    1. In the Enterprise Project Name drop-down list, click the drop-down arrow, and select the enterprise project to which the resource to be managed belongs.
    2. In the Region drop-down list, click the drop-down arrow, and select the region to which the resource to be managed belongs.
    3. Select the resource to be managed in the ECS list.
    4. Click Next.
    Figure 2 Selecting an ECS

  5. Configure the parameters.

    1. Select an application.
      • Click the drop-down arrow, and select an application.
      • Click Create Application, and enter information such as the name to create an application.
    2. (Optional) Configure parameters.

      You can add parameters to identify applications.

      You can add a parameter group, specify the name and type of each parameter in the group, and add parameter content. For the Type parameter, select either Text or Numeral as required.

      Up to 10 parameter groups and 100 parameters can be created. The parameter group names and parameter names must be unique.

    3. Click Next.
    Figure 3 Configuring parameters

  6. Confirm the specifications of the resource to be managed, and click Submit.

    Resources in the application have been managed. You can view the application status in the application list.

    Figure 4 Confirming specifications
    Figure 5 Managed application

Follow-Up Operations

After resources in the application are managed, you can perform the following operations on the application.