Designing Processes

Business Process Architecture (BPA) is developed based on the value streams, and is used to guide and standardize the management of BT&IT requirements and ensure the efficiency of business requirement handling, analysis, and delivery. The BPA puts high-value requirements first, which maximizes the business value, assists in business operations, and facilitates goal achievement.

Creating a Business Process

Design the process from L1 to L 3 based on service requirements.

  1. Log in to the DGC console, select a DGC instance, and click Access.

    On the displayed page, click the Workspaces tab. In the workspace list, locate the required workspace.

  2. Click Data Design of the corresponding workspace to access the Data Design console.
  3. On the Data Design console, choose Processes from the left navigation bar. Click to create a process. When creating a process for the first time, you can create a process under the root node.
    Figure 1 Process design
  4. In the displayed dialog box, set parameters as prompted and click OK.
    Figure 2 Creating a process
    Table 1 Parameters for creating processes

    Parameter

    Description

    Process

    Process name. Only letters, digits, and underscores (_) are allowed.

    Owner

    Process owner. Only the workspace administrator or developer can be set as the owner.

    Select Process

    Home process

    Description

    A description of the process

  5. Repeat the above steps in sequence to create more processes or subprocesses. Generally, processes from L1 to L3 need to be designed. The first layer is identified as L1, the second layer as L2, and the third layer as L3.

    The following is an example:

    Figure 3 Process design example

Exporting a Process

You can export the processes that have been created in Data Design to files.

  1. On the Data Design console, choose Processes from the left navigation bar.
  2. Click Export above the process list. After a few seconds, a message is displayed in the upper right corner of the page, indicating that the process is exported successfully.

    A subjector process has a hierarchy. You can export only data of all levels.

Importing a Process

  1. On the Data Design console, choose Processes from the left navigation bar.
  2. Click Import above the process list.
  3. In the Import Process dialog box, set the parameters as prompt, and click Upload and Verify.

    Table 2 Parameters for importing processes

    Parameter

    Description

    Update Existing Data

    Whether to update the existing processes of DGC Data Design. The options are as follows:

    • No: If you select this option, the existing process will not be updated.
    • Yes: If you select this option, the existing process will be updated.

    During the import, only process creation and update are allowed.

    Upload File

    Select the file you want to import.

    You can use either of the following methods to obtain the file to be imported:

    • Downloading the process template and fill in it

      In the Import Table dialog box, click Process Template to download the template, set parameters in the template as required, and save the settings. See Table 3 for template parameter details.

    • Exporting a pocess

      You can export the processes created in Data Design of a DGC instance to Excel files. Then, import the Excel files. For details, see Exporting a Process.

    Table 3 describes the parameters in the downloaded template. Parameters whose names start with an asterisk (*) are mandatory, and parameters whose names do not start with an asterisk (*) are optional. One record is required for one process.

    Table 3 Parameters in the process import template

    Parameter

    Description

    Process

    If it is a level 1 process, this field can be left blank.

    If it is not, this field is mandatory. If there are multiple processes, separate them with slashes (/), for example, "Integrated Product Development/Development Lifecycle".

    *Name

    Process name

    *Owner

    Process owner Only the workspace administrator or developer can be set as the owner.

    Description

    A description of the process

  4. The import result is displayed in Last Import in the Import Process dialog box. If the import is successful, click Close. If the import fails, you can view the failure cause, correct the template file, and upload it again.

Deleting a Process

You can delete the processes that are no longer used. Deleted processes cannot be recovered. Exercise caution when performing this operation. If a business process has subdirectories or subprocesses, you need to delete the subdirectories or subprocesses progressively.

  1. On the Data Design console, choose Processes from the left navigation bar.
  2. In the process list, select the process to be deleted and click Delete above the process list.
  3. In the dialog box that is displayed, click Yes.