Help Center> Cloud Search Service> User Guide> Managing Clusters> Binding an Enterprise Project

Binding an Enterprise Project

Each cluster must be configured with an enterprise project. If this parameter is not required, you can bind the cluster to the default project. For a cluster that is created before the binding of the enterprise project feature, the enterprise project of the cluster is bound to the default project. You can modify the bound enterprise project based on the site requirements.

To use the enterprise project function, you need to assign permissions to the corresponding account. You can submit a service ticket to apply for the permissions.

Binding an Enterprise Project

When creating a cluster, you can bind it to an enterprise project by specifying the Enterprise Project parameter. For details, see Creating a Cluster.

Modifying an Enterprise Project

For a cluster that has been created, you can modify the bound enterprise project based on the site requirements.

  1. On the CSS management console, click Clusters.
  2. In the cluster list on the displayed page, click the target cluster name to switch to the Basic Information page.
  3. On the cluster details page, click the parameter value to the right of the Enterprise Project parameter. The Enterprise Project Management page of the Enterprise Management Service is displayed.
  4. On the Resource tab page, select the corresponding Region and select CSS from the Service drop-down list box. In this case, the corresponding CSS cluster is displayed in the resource list.
    Figure 1 Filtering CSS clusters
  5. Select the cluster whose enterprise project needs to be modified and click Remove.
  6. On the Remove Resource page, specify Mode and select Destination Enterprise Project, and click OK.
    Figure 2 Removing resources
  7. After the cluster resources are removed, its information cannot be obtained from the original enterprise project resource page. You can view the enterprise project bound to the cluster in either of the following ways:
    • Switch to CSS cluster list, where the value of Enterprise Project for the cluster is changed to the new enterprise project.
      Figure 3 Viewing the enterprise project corresponding to the cluster
    • On the Enterprise Management Service console, choose Project Management in the navigation pane on the left. On the Enterprise Project Management page, click View Migration Event to obtain the cluster information.
      Figure 4 Viewing resources