Overall Migration Solution

Migration Solution Description

The following figure shows the overall process for migrating CS data to DLI.

Figure 1 Process flow

To ensure smooth migration, set up a CS image environment in DLI and commission services before migration based on the preceding figure. After the environment is verified successfully, select a method to migrate CS services to DLI based on your service scenario and the existing reliability solution.

Procedure

  1. Enable DLI and configure permissions in DLI based on the permission model in CS.
  2. Sort out your resource requirements, create queues correspondingly, and connect the network.
  3. Use the Data Migration function provided by CS to migrate your data.
  4. Complete job commissioning and adaptation reconstruction in DLI.
  5. Test and verify the job functions in DLI before the migration.
  6. Select a proper method to migrate CS data based on service scenarios and reliability solutions.
  7. Continuously monitor the service status in DLI.
  8. Clear resources in CS.

Data Migration Solution Using the Flink Savepoint

For details about how to migrate data using the Flink savepoint, see the following figure.

Figure 2 Process flow