What Is the Sequence of Using Resource Packages with the Same Attributes?
Use Sequence
If there are multiple resource packages with the same attributes, they will be used in the order of earliest to latest effective time and expiration time.
Example
|
Scenario |
|
|
A customer purchases two standard storage packages (multi-AZ) in region CN North-Beijing4.
|
|
|
Use Sequence |
|
|
From Oct. 1 to Oct. 9 |
Package A is used. If the used Standard storage space exceeds 100 GB, the customer will be billed for subsequent usage on a pay-per-use basis. |
|
From Oct. 10 to Nov. 30 |
Both packages A and B are used. Package A is used first. If the usage exceeds 100 GB, package B is used to offset subsequent usage. When package B's quota (600 GB) is used up, the customer will be billed on a pay-per-use basis. |
|
From Dec. 1 to Dec. 9 |
Package A is expired. Only package B is used. The customer is billed on a pay-per-use basis for subsequent usage when package B's quota (500 GB) is used up. |
|
From Dec. 10 on |
Both packages A and B are expired. The customer is billed on a pay-per-use basis. |