| Viewing a backup plan | - Viewing basic information:
On the navigation bar, choose > Backup Plan. - Viewing details:
On the navigation bar, choose > Backup Plan. On the page that is displayed, click the backup plan that you want to view. | Background This operation displays information about a backup plan, including the status, associated protected set, associated repository, and the start time of the latest backup job. Precautions Before performing this operation, ensure that the backup plan has been created. | Status Status of the backup plan. The value can be: Active Indicates that the backup plan is in the Active state. When the backup plan in this state, the system can perform backup jobs as scheduled. In the preview area, you can click the arrowhead beside Active to deactivate the backup plan. Inactive Indicates that the backup plan is in the Inactive state. When the backup plan in this state, the system cannot perform backup jobs as scheduled but you can manually perform backup jobs. In the preview area, you can click the arrowhead beside Inactive to activate the backup plan. |
| Executing a backup plan | On the navigation bar, choose > Backup Plan. Move the mouse pointer to the backup plan that you want to execute and click in the button area on the right, or click the backup plan that you want to execute and click in the preview area on the right. | Background This operation executes a backup plan. Precautions - Before performing this operation, ensure that the backup plan has been created.
- If backup jobs are being performed based on the backup plan, the system will add new backup jobs and set them to the Pending state.
- If backup jobs have been performed based on the backup plan, the system automatically performs incremental backup after you click
. - If no backup jobs have been performed based on the backup plan, the system automatically performs full backup after you click
. - You can click the row where the backup plan is located at any time after the backup plan is created. The details of the backup plan will be displayed on the right side of the interface. Click Full Backup. Then the system will perform a full backup as required.
| None |
| Modifying a backup plan | On the navigation bar, choose > Backup Plan. Move the mouse pointer to the backup plan that you want to modify and click in the button area on the right, or click the backup plan that you want to modify and click in the preview area on the right. | Background This operation associates a new protected set and backup policy with a backup plan. After the backup plan is modified, the system will execute backup jobs based on the modified backup plan. Precautions Before performing this operation, ensure that the backup plan has been created. | Offline Transmission - Disabled: select this option when Teleport has been sent to Huawei data center and data has been uploaded.
- Enabled: select this option when you need to use Offline Transmission.
- Suspended: select this option when Teleport or disk has been disconnected from the VMware environment.
|
| Cloning a backup plan | On the navigation bar, choose > Backup Plan. Move the mouse pointer to the backup plan that you want to clone and click in the button area on the right, or click the backup plan that you want to clone and click in the preview area on the right. | Background This operation clones a backup plan to create a duplicate. Then you can modify the duplicate to quickly obtain a new backup plan instead of creating one. Precautions Before performing this operation, ensure that the backup plan has been created. | None |
| Deleting a backup plan | On the navigation bar, choose > Backup Plan. Move the mouse pointer to the backup plan that you want to delete and click in the button area on the right, or click the backup plan that you want to delete and click in the preview area on the right. | Background Background This operation deletes an unneeded backup plan. Precautions - Before performing this operation, ensure that the backup associated with the backup plan to be deleted will not be used to restore data.
- Ensure that no backup job associated with the backup plan to be deleted is being executed in the system. Otherwise, the deletion fails.
| None |
Did this article solve your problem?
Thank you for your score!Your feedback would help us improve the website.